SEAGOING

AND OTHER

CONCRETE SHIPS

OXFORD TECHNICAL PUBLICATIONS

SEAGOING

AND OTHER

CONCRETE SHIPS

BY

N. K. FOUGNER, C.E.

M.AM.SOC.C.E., MEDLEM NORSK JNGENIEUR FORENING, ASSOC.INST.N.A.

LONDON HENRY FROWDE AND HODDER & STOUGHTON

THE LANCET BUILDING 1 BEDFORD STREET, STRAND, W.C.2

- » * . .*•

First published 1922

PRINTED IN GREAT BRITAIN

BY HAZELL, WATSON AND VINEY, LD.

LONDON AND AYLESBURY.

PREFACE

THE aim of the author has been to present a true record of the principal seagoing concrete ships actually built up to the present, and to analyse the merits of these ships in comparison with ships built of steel and wood.

The main part of this book is based on personal experience gained in the construction of about thirty vessels of concrete during the past five years. The information referring to ships built by others has been obtained partly through correspondence with the designers, builders, or owners, and partly from state- ments published by them in the engineering press. As far as possible, facts have been ascertained from official documents, and reference to the source of information is made in each case

The calculations are condensed in the Appendix and have, been avoided in the general text in order to facilitate the reading for shipping people and others, who will play an important part in the further development of the new type of ships without being concerned in the technical side of the question. The usual methods of calculating displacement, speed, etc., found in standard works on naval architecture, have been omitted, as they are practically identical for concrete ships.

Numerous technical papers and articles on concrete ships have appeared in the press, but unfortunately the hopes or opinions expressed have frequently been based on anticipation rather than on actual experience. The result has been a mass of conflicting reports which have caused much confusion on the subject.

If the present book should aid in clearly establishing the true status of the best type of seagoing concrete ship to-day, and thus form a basis for further development, the author's chief object will be accomplished.

N. K. F.

CHBISTIANIA, 1922.

515600

CONTENTS CHAPTER I

PAGE

INTRODUCTORY 1

CHAPTER II

THE FIRST SEAGOING CONCRETE SHIP

Preliminary Consideration — Government Permit — Assumptions for Calculation Purposes — Method of Construction — Engine Foundations and Stern Post — Concreting — Equipment — Launching — Trials — Docking for Inspection — Results of Experiment ....... 7

CHAPTER III

M.S. STIER AND M.S. ASKELAD

Negotiations — M.S. Stier — Strength Calculations — Constructional Details — Construction — Official Trials — M.S. Askelad — Constructional Details — Official Trials — The First North Sea Trip — Subsequent Service — Summary of Results . . . . . . . . . .19

CHAPTER IV

COMPARISON OF SOME SHIPS BUILT TO CLASS WITH THE AUTHOR'S TRIAL SHIPS

Classification of Concrete Ships — Comparative Values of Cargo Carriers — American Concrete Ships — S.S. Selma and Latham; S.S. Cape Fear and Sapona ............ 41

CHAPTER V

CONCRETE TUGS, FLOATING DOCKS, LIGHTSHIPS, AND

LIGHTERS

The First Concrete Tug — The First Concrete Floating Dock— The First Concrete Lightship — Concrete Water-carrier — Concrete Lighters . 50

CHAPTER VI

SHIPS BUILT IN THE UNITED STATES

The Faith — U.S. Shipping Board Investigations — The First U.S. Standard Concrete Ship — Ships actually completed — Oil-Tankers — Oil- Storage generally .......... 68

CHAPTER VII

DAMAGES AND REPAIRS

M.S. Askelad — M.S. Nicanor— M.S. Stier— S.S. Polias ... 86

vi i

viii CONTENTS

CHAPTER VIII

COMPARISONS OF CONCRETE SHIPS WITH STEEL SHIPS

PAGE

First Cost — Units of Material and Labour per Ton — Examples of Costs — Speed— Strength — Running Expenses — The Future of the Concrete Ship 96

CHAPTER IX

SHIPBUILDING CONCRETE

Introductory — Portland Cement — Water — Aggregate — Impurities in Aggregate — Sand — Light-weight Aggregate — Proportions of Mixture — Mixing — Placing and Curing — Steam Curing — Freezing — Vibration, Pres- sure, etc. — Compressive Strength — Shear Strength — Bond Strength — Elasticity— Watertightness — Contraction and Expansion — Trass Concrete — Action of Sea- water — Action of Oils. etc. — Repairs — Fire-resisting Power 107

CHAPTER X

STEEL REINFORCEMENT Types— Quality— High-Carbon Steel 146

CHAPTER XI

CONDITIONS GOVERNING STRUCTURAL DESIGN Theory of Design — Side Frames — Bottom Frames — Centre Keelson — Longitudinal Strength — Strength of Shell Slab — Watertight Bulkheads — Norwegian Government Requirements — Deflection Test on Lighter . . 150

CHAPTER XII

GENERAL METHOD OF CONSTRUCTION

Preliminary Work — Bottom Floor Prepared — Outside Centring Com- pleted— Bottom and Side Reinforcement in Place — Frame Centring and Reinforcement in Place — Deck Centring in Place — Centring and Rein- forcement Completed — Concreting — Concreting Finished — Cement Finish — Cement- Gun Concreting . . . . . . . . .169

CHAPTER XIII

SOME SPECIAL METHODS OF CONSTRUCTION AND PARTICULAR SHIPS

M.S. R. P. Durham — M.S. Linnea — " Pre-cast " Systems — S.S. Armistice — S.S. Bartels — Present Tonnage of Concrete Ships — Author's Recom- mendations ........... 181

APPENDIX

STRENGTH CALCULATIONS FOR M.S. ASKELAD . . .197

INDEX 212

SEAGOING

AND OTHER

CONCRETE SHIPS

CHAPTER I INTRODUCTORY

WHEN a new idea or invention is first put into service it is naturally received with a certain amount of antagonism ; the concrete ship is no exception to this rule. The doubts still abounding in regard to the concrete ship arise principally from ignorance of what has already been accomplished ; and in order to appreciate what has been accomplished, and so acquire a basis for the formation of an intelligent opinion on the subject of concrete ships, it is desirable to study, however briefly, the development in the use of other shipbuilding materials.

From the earliest days down to almost the middle of the nineteenth century wood was the material of which ships were built. The use of wood was not a matter of choice, for it was the only material available ; and for the ships built in the days before the nineteenth century wood was not an unsuitable material.

The proven suitability of wood, and a natural tendency to the use of a buoyant material for a structure whose essential quality is buoyancy, probably retarded the consideration of alternative materials. But the developments in shipping resulting from the adoption of steam machinery for propulsion stimulated the desire for improved methods of constructing ships. The first iron steamer was the Aaron Manby, built in London in 1821, although the first use of iron as the material for a ship probably dates back to 1777, when an iron lighter was built in Yorkshire. The objections urged against iron as the material for shipbuilding were that iron was too heavy and could not float ; that iron was too brittle and, therefore, liable 1

„« «. *

1U

2 SEAGOING AND OTHER CONCRETE SHIPS

to severe damage in the event of grounding, which damage would be difficult to repair ; that the bottoms of the ships would become rapidly fouled with marine growth ; and that iron would affect the compass by creating magnetic disturbances.

The first objection was soon ruled out ; iron ships not only floated as well as wood ships, but proved even to be lighter than wood ships.

As regards the second objection, there were two historic cases of grounding which caused this one also to be ruled out. The first case is that of the Garry Owen, a coasting steamer built at Birkenhead in 1834. On her maiden voyage the Garry Owen was driven ashore in a gale in company with a number of wood ships. The latter were all either completely wrecked or very seriously damaged ; the Garry Owen was undamaged. The second case is that of the Great Britain, the first Atlantic liner to be built of iron and to have a screw propeller. She was built at Bristol in 1843 to the design of I. K. Brunei and was the largest ship of her day. She had been only about a year in service when she was run ashore on the east coast of Ireland, where she remained throughout a whole winter exposed to the full force of the sea. When refloated she was found to be very little the worse for her experience. These two cases did much to establish the reputation of iron as a shipbuilding material.

The objections relating to marine growth and magnetic disturbance were not found to be serious. Frequent cleaning and painting of the under body keeps down marine growth ; and compensation for the magnetic disturbance due to the iron hull can be made in the compass.

The principal consideration underlying the transition from wood to iron was structural strength. It was found practically impossible to make wood ships adequately strong if the length approached 300 feet ; and this length was not sufficient for the shipping needs of the time. A further consideration underlying the transition was the difficulty of making a wood stern post and stern construction fit to withstand the forces developed by a propeller, and this consideration became increasingly important with increase in engine power. But prejudices are not easily dispelled. So late as 1861 the British Parliament appropriated one million pounds sterling for the purchase of timber for the construction of wood warships.

INTRODUCTORY 3

During the war there was a partial return to wood as a ship- building material in the United States. This was brought about by the great desire for mercantile tonnage and the limited capacity of the American steel works for the production of shipbuilding material. The results were not satisfactory ; the ships were leaky and structurally weak. No doubt the results would not have been so bad had carefully selected, seasoned, timber been used instead of the " green " timber which was alone available. But on the whole, the programme of wood shipbuilding merely affords further justification, if any is needed, for the transition from wood to iron.

The next development in shipbuilding material was the substitution of steel for iron, a development in detail, however, rather than in principle. The principal defects of iron were its unreliable character and its distinct grain. The former rendered it almost impossible to guarantee the strength of any plate ; the latter resulted in the plate being stronger in one direction than in another. Steel is a very reliable material, and it has practically no grain, so that it is equally strong in all directions ; this latter quality is of some importance in a shipbuilding material, for there are few points in a ship where the principal stress is exactly longitudinal or exactly transverse, and there are almost as many directions of principal stress as there are points where stress exists. Steel has the further great advantage over iron of being about 25 to 30 per cent, stronger. The disadvantages of steel as compared to iron are greater liability to corrosion and, in the early days, increased cost.

The transition from iron to steel, though gradual, was not by any means such a slow process as the transition from wood to iron. There were, of course, difficulties to be overcome. At first the new material was uneven in quality and, in addition, the conditions under which it could be worked were different from those for iron ; these two considerations, separately and in combination, account for a large quantity of cracked and, therefore, discarded material. The difficulty as regards liability to corrosion was easily overcome ; this involves merely care in upkeep. The greatest difficulty was that of cost. But the difference in cost between a steel and an iron hull was not in the ratio of the cost per ton of steel to the cost per ton of iron ; for the greater strength of steel permitted a saving in weight of

4 SEAGOING AND OTHER CONCRETE SHIPS

material amounting to about 15 per cent. The increasing use of steel consequent upon a recognition of its advantages brought about a reduction in its cost, so that within a few years of the introduction of steel a steel hull was actually slightly cheaper than an iron hull ; nowadays a steel hull is very much cheaper than an iron hull — indeed, iron hulls are seldom built. . An idea of the rate of the transition from iron to steel can be obtained from the pages of Lloyd's Register. In 1883, when iron shipbuilding was at its zenith, 860,000 tons of iron ships were built in British yards ; by 1888 this amount had decreased to 50,000 tons, and by 1895 to 10,000 tons. Steel ships were first registered in 1878, their tonnage amounting to 4,500 tons. In 1880 about 4 per cent, of the tonnage built in British yards was of steel ; by 1885 this percentage had increased to 60, and by 1890 to about 95.

The next development in shipbuilding material is the use of reinforced concrete. This development is only in its initial stages, but in the following chapters an outline of actual achieve- ment is given ; it must be borne in mind that, as indicated above, over forty years elapsed between the first attempt at iron shipbuilding and the building of the first iron steamer, and a further twenty years before iron was recognized as being suitable for the construction of seagoing ships, whereas only four or five years have elapsed since the building of the first seagoing concrete ship.

In the consideration of concrete as a shipbuilding material it is not necessary to draw any comparisons with wood, for wood as a material for seagoing ships has, on the considerations outlined above, been discarded. In what follows, therefore, the case for concrete is presented with steel as the background.

An opinion commonly expressed by shipping people is that concrete may be suitable for the construction of lighters and such small craft, but is totally unsuitable for seagoing ships. The author is, however, of a different opinion and maintains that concrete is even better suited for the construction of seagoing ships than of lighters. Lighters must often be of the smallest possible dimensions and draught for a given cargo capacity ; and their shell must be particularly capable of withstanding local blows and scratches due to rough handling, collisions with wharves, etc. It is in regard to these requirements that concrete

INTRODUCTORY 5

compares least favourably with steel, as will be indicated in the following pages and throughout the book.

It is common knowledge that concrete hulls are heavier than steel hulls of the same outside dimensions. This is due to the fact that concrete is not so strong as steel and, therefore, if a concrete hull and a similar steel hull of the same dimensions are to be equally strong, as they ought to be, a greater weight of concrete than of steel must be used. The author does not believe that concrete will ever be improved to the extent that it will be equal to steel in strength and elasticity ; but such an improve- ment is not necessary, since concrete has compensating advan- tages over steel.

In comparisons between concrete and steel ships it is neces- sary to assume as a basis either equality of deadweight carrying capacity or equality of total displacement. All the concrete ships built by the author were ordered on the basis of a stipulated deadweight, and it is reasonable to assume that for some time to come this custom will prevail on account of the present uncertainty of the calculations of hull weight made by inexperienced builders. Considering, therefore, a concrete ship and a steel ship of equal deadweight carrying capacity, it is obvious that the former will have a greater total displacement because of her greater weight of hull ; and the greater displace- ment can, in general, only be obtained by the adoption of larger dimensions. Hence the concrete ship has a greater cubic capacity, and a larger space available for deck cargo, than the steel ship. This is a distinct advantage in trades where the cargoes commonly carried are light and bulky, measuring about 70 cubic feet, or more, per ton weight. For example, by far the greater propor- tion of the war supplies transported from the United States to France were so light in relation to their bulk that the ships carrying them were completely filled before they had on board sufficient weight to sink them to their designed load draughts. Of course, the increased capacity involves the disadvantage of increased harbour dues, since these are assessed on a cubic capacity basis.

The foregoing elements in the comparison between concrete and steel can be grasped by anyone who reasons the matter out without any reference to actual experience with concrete. But the following facts are the results of experience, experience

6 SEAGOING AND OTHEE CONCRETE SHIPS

gained by the author from the construction of about thirty concrete ships, and experience gained by the owners, officers, and crew who have run these ships in overseas trade for some years :

Concrete ships

are cheaper to build, and cost less in upkeep, are less subject to vibration from engines or due to " panting," and, owing to the heavier hull, require less ballast when " light," and so have easier movements in rough seas,

are more quickly and more cheaply repaired, are fireproof, are not subject to corrosion, have better insulating properties for cargoes" such as ice,

fruit, etc.,

and are more easily kept clean. Steel ships have the following advantages : less weight of hull, the shell is better able to withstand local blows and scratches

resulting from rough handling.

The question of structural strength does not enter into the comparison since adequate strength can be provided in either material. The time of construction is generally less for concrete ships, but is not less than the war-time records achieved in steel construction. The speed is practically the same for ships of equal deadweight and engine power, but this comparison is much affected by factors such as underwater shape and external finish, whose influence may be greater than that of mere weight.

CHAPTER II THE FIRST SEAGOING CONCRETE SHIP

Preliminary Consideration — Government Permit — Assumptions for Calcu- lation Purposes — Method of Construction — Engine Foundations and Stern Post — Concreting — Equipment — Launching — Trials — Docking for Inspection — Results of Experiment.

Preliminary Consideration.— The construction of the Namsenfjord, the first seagoing concrete ship, was an experiment based on the favourable experience gained by the author from the construc- tion of a concrete lighter in Manilla during his activity as a Civil Engineer in the Far East.

In 1910-11 preparatory investigations of the possibility of constructing seagoing concrete ships were begun, and the author's first patents are dated January 1912. The building of the first seagoing concrete ship was not, therefore, entirely due to the world war ; but lack of capital and other circumstances delayed the realization of ideas fully worked out in theory at an earlier period.

In Norway anyone is free to build lighters of concrete or any other material without regard to Government rules ; but the construction of seagoing ships intended to carry a Norwegian crew and flag is subject to the control of the Department of Shipping.

In 1916 the author forwarded plans of a seagoing concrete lighter of 2,700 tons deadweight carrying capacity to the Depart- ment of Shipping. In order to obtain expert opinion on the proposal the Department referred the plans to a specially appointed Technical Committee.

The utmost doubt was freely expressed as to the possibility of a concrete ship having the necessary strength and elasticity to resist strains due to heavy seas and to vibrations from the engines. Naval architects, concrete engineers, and sailors expressed their unreserved opinions, through the press and otherwise, that the whole idea was impossible and that a seagoing

i

8 SEAGOING AND OTHER CONCRETE SHIPS

concrete ship was doomed to disaster the first time she encoun- tered rough weather. It was no wonder, therefore, that the Government authorities hesitated to grant a permit for the construction of such a ship.

Since no shipowner was found willing to take the risk involved in ordering the first seagoing concrete ship, the author's firm decided to build the Namsenfjord at their own expense and for-

FIG. 1. — M.S. Namsenfjord, on trial during August 1917. The First Seagoing

Concrete Ship.

warded an application to the Department of Shipping on 22nd November 1916 for the necessary permit. The reply from the Department, dated 9th December 1916, was to the effect that a definite opinion could not be given until the proposal had been investigated by the Technical Committee appointed to consider the earlier proposal ; further, the author's firm was required to promise to bear the expenses connected with the investigation.

The project was discussed at a number of conferences with

THE FIRST SEAGOING CONCRETE SHIP 9

the Director of Shipping and his chief engineer, both of whom gave it full consideration. Government officials closely watched the practical experience gained daily with the concrete lighters built by the author's firm ; and detailed plans and calculations were worked out for the ship. Meanwhile the Technical Com- mittee got to work ; and it was decided that plans and calcu- lations must be approved by the Committee before the ship could be built.

Government Permit. — From the elaborate preparations being

FIG. 2. — M.S. Namsenfjord. General Arrangement.

made it appeared that the investigation of the proposal would take a long time ; and so the author asked the Chairman of the Technical Committee, Dr. J. Bruhn, to support his applica- tion to the Government for special permission to construct the Namsenfjord on his own responsibility without waiting for the approval of the Committee. The application was forwarded to the Department of Shipping on 9th March 1917. The reply from the Director of Shipping, dated 31st March, granted the desired permission, but stipulated that the ship should not be put into commission as a cargo carrier without a permit from the Department, that such permit should be for smooth- water

10 SEAGOING AND OTHER CONCRETE SHIPS

service only, and that it should be given for a short period only, being renewed for successively increasing periods if the per- formance of the ship were satisfactory.

While awaiting hopefully the grant of the Government permit for the construction of the ship negotiations had been carried on with several shipowners ; and in January 1917 a contract was signed with Mr. Anzjon, of Namsos, for delivering Namsenfjord complete at a price of kr. 90,000 (about £5,000) ; Mr. Anzjon intended to use the ship for the carriage of lumber on the coast, but wanted her equipped also for the North Sea trade.

The main particulars of Namsenfjord are :

Length over-all, 84 feet ; breadth, 20 feet ; depth, 11-5 feet.

Cargo capacity (deadweight), about 200 tons.

Capacity of oil and fuel tanks, 5-5 tons.

Capacity of freshwater tanks, 8-0 tons.

Engine, Bolinder crude oil motor, 80 B.H.P.

Block coefficient, 0-75.

Designed speed, 7J miles per hour.

Total crew, 7 men.

Assumptions for Calculation Purposes. — In order to ensure that the ship would be sufficiently strong, consideration was given to :

(a) Local stresses, in bottom, sides, and deck, due to water- pressure and to weights of cargo carried.

(b) longitudinal stresses, in bottom, sides, and deck, due to bending arising from local inequalities of weight and buoyancy along the length of the ship considered as a girder.

(c) Stresses due to vibrations set up by engines.

For calculation purposes the following assumptions were made as regards permissible stresses :

Concrete : to have an ultimate compressive strength of at least 4,000 Ib. per sq. inch at 28 days, the proportions of mixture and the class of material being determined from practical tests before commencing the actual pouring.

Permissible compressive stress, 1,000 Ib. per sq. inch. Permissible shearing stress, 120 Ib. per sq. inch.

Steel Reinforcement : to be of open hearth, mild, medium- grade steel, of ordinary shipbuilding quality, having an ultimate

THE FIRST SEAGOING CONCRETE SHIP

11

tensile strength of 28 to 32 tons per sq. inch and an elongation of 20 per cent, in eight inches length.

Permissible tensile stress, 12,000 Ib. per sq. inch. Permissible shearing stress, 8,000 Ib. per sq. inch.

The methods of calculation are discussed in Chapter XI. and actual specimen calculations are given in the Appendix.

The disposition and amount of steel reinforcement are shown in Fig. 3. Rods of from J to 1J inch diameter were used, amount- ing in all to 10 tons.

FIG. 3. — Midship section of M.S. Namsenfjord. Left half through Hatch; right

half through Deck.

Method of Construction. — The actual construction of the hull was carried out in accordance with a system devised by the author, using a perforated metal lath instead of wood forms for the sides, deck, transverse bulkheads, interior water tanks, etc. Wood centring was, however, used for frames and deck beams. The metal lath was stiffened and supported by the wood boxes for frames and beams. The main reinforcing bars were tied to the metal mesh. One layer of mesh was placed near each surface of vertical plating, and concrete was poured between ; the two surfaces were afterwards finished with cement mortar.

12 SEAGOING AND OTHER CONCRETE SHIPS

Engine Foundations and Stern Post. — The most important and difficult details were the engine foundations and the stern post with rudder attached. Upon the satisfactory solution of the problems involved in the design of these elements depended largely the ability of the concrete ship to resist the strains due to vibrations of the engines. It was hoped that the concrete ship would show less vibration than a steel ship ; should this

FIG. 4. — Namsenfjord from aft, July 1917. The lower wood fender has now been removed as it was found unnecessary.

not be the case the result might be disastrous for the mechanically propelled concrete ship.

The engine foundation consists of two heavy girders, parallel to the centre-line of the ship and connecting five transverse frames. The stiffness of these girders ensures that the loads due to engine vibration will be properly distributed over the transverse frames and bottom slab. The engine bed-plate was of cast iron, with holes for eight 1J inch holding-down bolts ; openings were arranged in the concrete foundation girders to

*st •*

14 SEAGOING AND OTHER CONCRETE SHIPS

give access to the bolt-heads. It was considered preferable to arrange wood packing between the engine bed-plate and the concrete girders rather than to secure the bed-plate to the concrete direct. The purpose of the packing is to relieve, to some extent, the load on the holding-down bolts. The wood packing was of oak, seven inches thick ; in later ships, however, the thickness has been reduced to two inches. Heavy steel reinforcement was placed near the tops of the foundation girders and carried down at the ends to the bottom slab and transverse frames for anchorage. Steel washers were arranged under the holding-down bolt-heads, and the holes in the girder were filled in with cement mortar after the bolts were placed. The arrange- ment has proved satisfactory, no trouble having been experienced up to date.

From Fig. 5 it can be seen that there is an interior stern post of concrete constructed as part of the concrete hull. To the concrete stern post is attached a wrought-iron post of rect- angular section having a bearing for the propeller and a vertical post for the rudder. The wrought-iron post is secured to the concrete post by 17 anchor bolts 15-18 inches long and f inch diameter with hooked ends ; these bolts were screwed into the wrought-iron post on port and starboard sides alternately and had their heads clenched. In addition, steel plates eight inches wide were riveted to the wrought-iron post to form a channel section enveloping the end of the concrete. The stern tube is of cast iron, and is screwed into the wrought-iron post.

Concreting. — Before concrete was poured all the steel rein- forcement in bottom, frames, and deck was placed in position. Particulars of the mixtures used are given in Chapter IX. The bottom, sides, and deck were concreted in a continuous operation. Thereafter the transverse bulkheads, internal walls for water tanks, galley, lamp-room, etc., were built by plastering cement mortar on a metal mesh with an auxiliary reinforcement of round bars horizontally and vertically. Steel dowels were inserted in bottom and side frames while these were being con- creted and recesses provided for the anchorage of the transverse bulkheads to the hull ; this arrangement has proved satisfactory as there have been no cracks observed between the bulkheads and the frames.

Equipment. — The deckhouses were made of wood. Outside

THE FIRST SEAGOING CONCRETE SHIP 15

fenders and bilge keels of oak were bolted to the concrete hull, | inch diameter bolts having been embedded in the concrete beforehand. The hatch coamings were protected against chipping by steel beams of channel section along the upper edges, the webs of the channels being upwards. Wood ceiling 2J inches thick was fitted on top of the inner bottom, and wood sparring along the faces of the transverse frames ; see Fig. 3.

Officers' quarters, galley, etc., were located in the deckhouse, and the crew's quarters under the deck forward. A 5 H.P. motor winch was arranged on deck near the main hatch, and the remaining equipment was similar to that on any other ship of the size. In order to save weight open rails were fitted along the sides rather than bulwarks.

Launching. — The ship was built on a platform consisting of removable shuttering which acted as forms for the bottom. The platform was fitted on rollers, and when the hull was prac- tically finished the platform, together with the ship, was pulled by an electric winch on to a steel launching car. When the ship was on the launching car the propeller, shaft, and rudder were shipped, and everything was ready for the launch on 25th July.

The first attempt at launching was unsuccessful owing to the car jumping the track, due to the flanges of the wheels being shorn off. The second attempt was also a failure owing to settlement of the foundation piles of the slipway after the launching car and ship had been lifted back into place. Applica- tion was then made for the use of the floating crane belonging to the Norwegian Navy. The crane was anchored alongside the slipway, three wire strops were placed round the ship, and the Namsenfjord was lifted in the air and lowered into the water on the morning of 2nd August 1917.

Trials. — A couple of days after launching the machinery was installed, and on 5th August the engine was tried while the ship was tied to the wharf. Everything went well and on the follow- ing day a private trial was made by the author on the Sound at Moss.

On 8th August the Namsenfjord went on her official trial with the Director of Shipping, his Chief Engineer, and several consultants on board. A southerly gale was blowing in the Christianiafjord which set up a heavy sea and so gave a good opportunity to test the ship for seaworthiness, strength, and

16 SEAGOING AND OTHER CONCRETE SHIPS

general behaviour. The ship was light during the trial, which lasted four hours and was entirely successful. The pilot in charge expressed his great satisfaction with the ship, particularly in regard to her easy movements, slight vibration, and steady steering when going into a head wind and a heavy sea. The average speed was 7J miles per hour ; it was found later that the speed when loaded was rather over 7 miles per hour. After the first few moments there was no nervousness on board in regard to the seaworthiness of the ship ; and the confidence gained will be appreciated when it is realized that the permit for the construction stipulated that the trials should take place in " enclosed waters where waves are entirely shut out."

Docking for Inspection. — Official comments were received from the Director of Shipping as a result of his inspection during the trial. Equipment and life-saving apparatus were slightly improved. But before a certificate for coasting service could be granted various trial trips with cargoes of stone, sand, or lumber had to be made.

On 31st August the Namsenfjord received her first cargo, of flour, at Moss and delivered it at Skien. A couple of minor leaks were discovered during the loading, and when the ship returned the Director of Shipping ordered her to be docked for inspection. On 10th September the ship was inspected by the Director of Shipping and assistants and by the Concrete Ship Committee. The report of the Committee stated that the inner bottom hindered inspection, also that some fine hair- cracks of the usual type appeared in the concrete, but that these were only in the surface and were not considered to jeopardize the strength of the ship. Leaks in the fore peak and crew's quarters were made tight and the peak tank tested under water-pressure ; the leaks were due to faulty work when placing bolts for the oak fenders on the stem.

Subsequent to the inspection the ship made several trips with cargoes between Moss and Drammen. On 6th October an official Certificate of Seaworthiness was issued, and a load-line assigned ; the certificate was valid for one month.

During the war there was a shortage of fuel oil in Norway, and the Namsenfjord, like other motor-ships, was forced to lie up for a while until oil bunkers were again procurable, when the ship was put into the coasting trade in southern Norway and

THE FIRST SEAGOING CONCRETE SHIP 17

afterwards to Namsos. At present she is carrying lumber on the northern coast of Norway.

The following weights were noted when the ship was com- pleted :

Tons.

Weight of hull 134

equipment .... 32 engine . . . . 8

Light displacement . . . .174 Deadweight . . . . .182

Load displacement . . . .356

Results of Experiment. — Generally speaking the Namsenfjord was a successful experiment. She proved that the problem of building a seagoing concrete ship propelled by engines was a practical proposition.

It is obvious that in a first attempt of this kind experience is gained from which details can be improved and errors avoided in subsequent ships ; the following are typical instances :

(a) Deckhouses of wood are not satisfactory, since the joint between the concrete coaming and the wood wall is never tight. Outside walls should therefore be of concrete.

(b) Steel capping on the top of the hatch coaming, as in Namsenfjord, is expensive and difficult to fit ; wood capping should be used.

(c) The corners of the main hatch should be rounded or bevelled and specially reinforced. No weakness was shown on Namsenfjord, but this is an exposed detail on all ships, and sharp corners should be avoided in concrete construction.

(d) A double bottom should not be arranged, at least in small and moderate-size ships, since it increases weight, complicates piping, and hinders inspection of the outer bottom.

(e) Wood packing should be fitted between the engine bed- plate and the concrete foundation girders ; this may be about two inches thick, that is, considerably less than adopted in Namsenfjord.

(/) Double metal mesh for walls is not desirable ; it is better to use only one layer of metal mesh, the concrete mortar being plastered on up to three inches in thickness. Additional rein- 2

18 SEAGOING AND OTHER CONCRETE SHIPS

forcement of round or square bars may be wired to the mesh as required.

(g) Gravel, even of | inch size, should not be used in concrete or mortar for vertical walls in small ships ; it prevents the mortar from properly surrounding the steel reinforcement, and frequently jumps out when mortar is thrown from a trowel on to a metal mesh. Since concrete containing gravel is, however, stronger and cheaper than mortar containing only cement and sand, it should be used in bottom and deck where the concrete is poured over surfaces which are nearly level.

CHAPTER III M.S. 8TIER AND M.S. A8KELAD

Negotiations — M.S. Stier— Strength Calculations — Constructional Details — Construction — Official Trials — M.S. Askelad — Constructional Details — Official Trials — The First North Sea Trip — Subsequent Service — Summary of Results.

Negotiations. — During the spring of 1917 the author had a number of interviews with the Director of Shipping on the subject of the construction of further seagoing concrete ships, and requested permission to proceed without waiting on the investigations of the Technical Committee which had been" appointed by the Department of Shipping. The matter was raised with the Prime Minister and eventually, following upon a conference called together by the Minister of Shipping and Commerce at which the Director of Shipping, the members of the Technical Committee, and the author, amongst others, were present, permission was granted for the construction of one ship of 600 tons deadweight carrying capacity and one ship of 1,000 tons deadweight carrying capacity. The permits were granted on condition that the author assumed all financial responsibility, and it was stipulated that the ships should be designed to have 20 per cent, more strength than the author would ordinarily consider sufficient on the basis of his calcula- tions, and that they should be particularly well equipped with pumps and life-saving appliances ; it was stipulated also that the ships should be tested in smooth water before proceeding to sea, and that they should make several trips on the open sea accompanied by escorting ships before being granted per- mission to enter the North Sea and Coasting Trades. The Technical Committee Accepted no responsibility for the behaviour of the ships, but desired to be kept informed as to the experience gained with them.

The permits for the construction having been obtained, negotiations were commenced with a view to finding purchasers

19

20 SEAGOING AND OTHER CONCRETE SHIPS

for the ships. As in the case of the Namsenfjord this was not an easy matter, as there were prejudices to be overcome. But on 8th May 1917 a contract was completed with Mr. Gunnar Brekke, of Christiania, for the 1,000-ton ship, and on 23rd May a contract was completed with Mr. G. M. Bryde, of Christiania, for the 600-ton ship. For each ship a fixed price was arranged for the reinforced concrete hull ; all other work, including the machinery installation, was to be carried out on the basis of actual cost plus a percentage for profit. For the 1,000-ton ship the fixed price for the hull was kr. 200,000 (about £11,000) ; for the 600-ton ship the corresponding price was kr. 118,000 (about £6,500).

M.S. " Stier." — This ship is a cargo carrier of the flush-deck type ; the main particulars are :

Length over-aU ..... 145' 0"

Length between perpendiculars . . 140' 0" Breadth over concrete . . . . 27' 6"

Depth ...... 15' 9"

Contract deadweight (including bunkers) 600 tons

Capacity of oil fuel tanks ... 20 tons Capacity of freshwater tanks . . 5 tons

Engine, Bolinder crude oil motor . . 320 B.H.P. Block coefficient . . . . . 0-77

Tonnage, gross ..... 462-03

nett ..... 258-44

Capacities of holds :

Fore hold ..... 15,010 16,341

After hold . . . .14,608 16,027

Hatches ..... 1,560 1,590

31,178 33,958

The general arrangement is shown in Fig. 6. It was originally intended to build a double bottom, but as the result of experi- ence with the Namsenfjord this intention was discarded. Water ballast amounting to 40 tons can be carried in the fore peak ; the after peak can be used as a trimming tank. The forecastle is raised about four feet above the main deck, and has concrete bulwarks. Open rails are fitted at the ship's sides between the

M.S. STIER AND M.S. ASKELAD

21

forecastle and the steel bulwarks arranged in way of the deck- house aft. The deckhouse contains accommodation for the officers and crew, 11 men in all. The fuel and lubricating oil are carried in three steel tanks. The fresh water is carried in concrete tanks arranged in way of the engine-room.

Strength Calculations. — In the building permit granted by the Government it was stipulated that the ship should be designed to have 20 per cent, more strength than the author would ordinarily consider sufficient. In order to determine the standard of strength the author worked out according to the rules of

FIG. 6. — M.S. Stier, 600 tons deadweight. Capacity Plan.

Norske Veritas the sizes of frames, beams, etc., for a steel ship of the same type and dimensions as Stier. For these members of the structure moments of inertia and resistance were calculated in the ordinary manner. These calculated values were then increased by 20 per cent, and the resulting figures used as the standards of strength for the reinforced concrete members. In calculating the strengths of the reinforced concrete members the permissible working stresses were taken to be 15,000 Ib. per sq. inch, tension in steel, and 750 Ib. per sq. inch, compression in concrete. The methods of making these calculations are discussed in Chapter XI.

22 SEAGOING AND OTHER CONCRETE SHIPS

The desire was, of course, to build the ships as light as possible ; but it was appreciated that nothing could be more harmful to the development of concrete shipbuilding than lack of strength in the first ships.

Constructional Details. — The structural arrangements are

FIG. 7. — M.S. Stier on official trial, 7th May 1918.

indicated in Fig. 8. The sizes of the main members are as follow :

Item. Depth. Width.

Deck beams .... 8"-12" X 6" Side frames . 11"-14J" x 6"

18"-24"

28" 3 J' '-4"

x sy

X 8J'

Bottom frames

Keelson ....

Deck slabs

Side slabs . . . . 4"-4J"

Bottom slabs .... 4"

The frame spacing is 4' 0".

The bottom frames are wider than the side frames ; the extra width was added on one side in order to simplify the

M.S. 8TIER AND M.S. A8KELAD

23

centring. The side slabs were increased in thickness in the regions of the quarter lengths where the maximum shear was expected. The deck slabs were increased in thickness towards the sides.

A longitudinal stringer, of concrete 14J" X 4", is arranged

LONG ITU D. SECTION NEAR. K.E.EL5ON

FIG. 8. — M.S. Stier. Midship Section.

above the bilge at the top of the wood flooring. The bilge keels are of concrete, of triangular section 7" X 1" rounded to about 3" at the outside ; the steel for these was placed before the hull was concreted, but the concreting was done after the bottom forms were removed.

The hatch coamings are of concrete 29" X 8", heavily rein-

24 SEAGOING AND OTHER CONCRETE SHIPS

forced, and run continuously from the fore hatch to the deck- house aft. The tops of the coamings are protected by oak

capping 5" thick. Between the hatches the deck is raised to near the top of the coaming.

The steel reinforcement is of round rods J" to 1J" diameter, the size and disposition of the principal bars being shown in Fig. 8.

M.S. STIES AND M.S. ASKELAD

25

The longitudinal reinforcing rods are not spliced by welding or directly connected in any other way. The rods are merely placed alongside each other with the ends overlapping for a length of 24 diameters ; a 90 degree hook, five diameters long, is made at each end of each rod. In this manner it is arranged that the tensile forces shall be transmitted by means of the bond between the concrete and the steel. The overlaps of the rods are distributed uniformly throughout the ship. The rods are spaced about one diameter apart (in the overlap) in order to allow of sufficient concrete being poured between them.

TRAN5V. SECTION NEAR. BULKHEAD LOOKING FORWARD

FIG. 10. — M.S. Stier. Engine-room Arrangement.

In all, 58 tons of steel were used in the construction of M.S. Stier.

The arrangement of stern post is similar to that in the Namsenfjord, only heavier ; it is shown in Fig. 9.

The arrangement of the engine seating is also shown in Fig. 9, and follows the lines of that in the Namsenfjord, except that in the Stier the oak packing under the bed-plate is only two inches thick.

The arrangement of the engine-room is shown in Fig. 10. The freshwater tanks are of concrete, and on top is arranged a steel fuel storage tank. On the starboard side, mounted on concrete bearers, are another steel fuel storage tank, a daily use fuel tank, and a lubricating oil tank. On the port side is

26 SEAGOING AND OTHER CONCRETE SHIPS

a 5 B.H.P. motor pump connected to all the pipe lines ; the repair bench and tools are also arranged on the port side.

An oak fender, 5" X 1", is fitted around the hull at the deck level. A similar fender, protected by J" steel plate, is bolted to the concrete stem.

The walls of the engine casing, also the walls of galley, w.c., and lamp-room are of concrete.

The navigating bridge has wood planking on steel beams.

A 5 B.H.P. motor winch of 1J tons lifting capacity is fitted at each hatch. The capstan is arranged for hand-power, but can be driven by a messenger chain from the forward winch. The steering gear is arranged for hand-power only. The bollards and fairleads are secured to the deck by heavy bolts having steel washers underneath. The deck is increased in thickness under all fittings.

The chain pipes are of cast iron, and the concrete sides are increased in thickness and have additional reinforcement where the chain pipes come through. In order to provide against abrasion by the anchors an outside finish of cement and iron powder, one inch thick, was applied from the stem to a short distance abaft the chain pipes ; this can be seen in Fig. 7. The extra cement finish was found to be unnecessary and has not been adopted in later ships.

Construction. — The Stier was constructed on a platform of wood sheeting supported on timbers across the launching ways. Double centring was used. For the exterior centring vertical templates shaped to the lines of the ship were erected on the wood platform, the spacing being generally about three feet, but closer than this towards the ends of the ship. The centring was of f" boards nailed to these templates.

Before the concreting was started all the reinforcement was in position, also all the centring with the exception of the inside forms for the side slabs, which were left open to facilitate con- creting. As the concrete worked upwards the interior centring was put in place ; thus the concrete was worked around the reinforcement at every level.

The mixture of the concrete was approximately

1 part cement : 1 f parts sand : f part gravel. This showed an average ultimate compressive strength of about 4,500 Ib. per sq. inch at 28 days.

M.S. 8TIER AND M.S. ASKELAD 27

The ship was successfully launched on llth March 1918, and was ready for trial seven weeks later.

Official Trials. — On 7th May M.S. Stier went through her first official trial, which was successful.

After preliminary trips in the Christianiafjord the ship went to Skien and on with a cargo of saltpetre to Stavanger and Bergen, thence to Aalesund, and back with a cargo of limestone to Fredrikshald. This was a heavy cargo and the ship en- countered a severe gale with a -rough sea at the exposed part of the coast. According to statements by the captain and pilot the weather was so rough that other ships of similar size refused to put to sea. This trip was, therefore, a decisive test of the seaworthiness and strength of the ship.

From the report, covering a month, of the Government Inspector who accompanied the ship it appears that the pumps were not used at all, as the ship proved to be absolutely tight.

Following on these trials the ship was docked on 7th June at Moss Verft for official inspection by the Director of Shipping, the Chairman of the Technical Committee on Concrete Ships, the consultants of the owners, and other officials. The ship was found to be in excellent condition without any signs of weakness in the concrete hull, and a certificate of seaworthi- ness was, therefore, issued by the Director of Shipping for one year.

The speed of the Stier is 8 knots loaded and about 8-6 knots light.

M.S. " Askelad." — This ship is a cargo carrier of the flush- deck type ; the main particulars are :

Length over-all . . . .176' 0"

Length between perpendiculars . 170' 0"

Breadth over concrete . . . 31' 0"

Depth 19' 0"

Contract deadweight (including

bunkers) .... 1,000 tons

Capacity of oil fuel tanks . . 30 tons

Capacity of freshwater tanks . 7 tons Engines, two Bolinder crude oil

motors 320 B.H.P. total

Block coefficient 0-77

28 SEAGOING AND OTHER CONCRETE SHIPS

Tonnage, gross . . . . 758-88 nett .... 422-55 Capacities of holds :

Bale. Grain,

cub. ft. cub. ft.

Fore hold . . . 22,600 25,000

After hold . . . 21,600 24,000

Hatches 1,800 1,800

46,000 50,800

The general arrangement of the ship is shown in Fig. 11. The deckhouse, containing accommodation for 13 men, has the external walls of concrete and the internal divisions of wood The roof of the house, forming the navigating bridge, is of wood on steel beams. The fore-peak ballast tank is of 60 tons capacity.

The actual strength calculations are given in the Appendix, and they are discussed in Chapter XI.

Constructional Details. — The structural arrangements are indicated in Fig. 12. The sizes of the main members are as follow :

Item. Depth. Width.

Deck beams . . . . 12" X 6J"

Side frames . . . . 13"- 17" X 6J"

Bottom frames . . . 22"-28" X 10"

Keelson 32" x 11"

Deck slabs .... 3J"-4J"

Side slabs .... 4"-4J"-5i"-6"

Bottom slabs 4" The frame spacing is 4' 0".

The structural arrangements are generally similar to those in the Stier.

The reinforcement is arranged in a similar manner to that in the Stier ; square " rib " bars were, however, used exten- sively. In all, 105 tons of steel were used.

The arrangement of the stern post is very simple, on account of the ship having twin screws. The propeller brackets are riveted to a vertical I-beam embedded in the concrete stern post. The rudder post is of cast steel with flanges riveted on, and is

uJ u

Q O

t

Q

g ^r

00

Ik

"en,

29

30 SEAGOING AND OTHER "CONCRETE SHIPS

secured in the same manner as the slorn post in Namsenfjord. Details of these arrangements are shown in Fig. 13.

The stern tubes are of cast steel, lined with cast iron, with

%"<> NEAR.

'OUTER. FACE.

REINFORCEMENT IN SIDES SEEN FROM OUTSIDE.

REINFORCEMENT IN BOTTOM

5EEN FROM ABOVE. IN KEE.LSON

HI"-!/

BOTH WAYS

FIG. 12.— M.S. Askelad. Half Midship Section.

flanges to take anchor bolts ; longitudinal ribs are arranged on the tubes to provide additional anchorage. Casings of steel plate for the protection of the propeller shafts are fitted between the propeller brackets and the stern tubes. Lubrication is provided for the inner ends of the tubes.

M.S. STIER AND M.S. ASKELAD

31

The engine seatings are similar to those in the Stier, but on a smaller scale because of the lower power of each engine as com- pared with that in the Stier.

The arrangement of the engine-room is shown in Fig. 13. The freshwater tanks are of concrete, and on top are the oil fuel storage tanks, of steel. The daily use tank and the lubricating

32

M.S. STIER AND M.S. A8KELAD 33

oil tank are arranged at the sides ; these also are of steel. The motor pump is of 5 B.H.P.

The deck machinery and fittings, also the fenders, are similar to those on the Stier.

The arrangement of centring and the general method of construction were the same as for the Stier. The mixture of the concrete was not constant ; an average was

1 part cement : 1-8 parts sand : 0-7 part gravel

This showed an ultimate crushing strength of more than 4,000 Ib. per sq. inch at 28 days.

No extra finish with iron powder was applied in way of the chain pipes ; the ships' sides were increased in thickness about 1 J inches on the inside and additional reinforcement fitted.

The Askelad was launched on 8th June 1917 ; but at that date she was called Oddfrid.

Official Trials. — On 21st August M.S. Askelad went through her first official trial, which was successful. The vibration was less than in the Stier, which had the same power, but concen- trated in one engine. It was noted also with satisfaction that the ship made nearly as good a speed as the Stier though having 75 per cent, more cargo capacity.

The Askelad carried out a number of trials with different kinds of cargoes on the coasts of Norway. The trials were perfectly satisfactory in so far as the concrete construction was concerned, but minor troubles were experienced with the engines and various improvements in deck fittings and equipment sug- gested themselves. During the month of November heavy weather was encountered by the ship in the course of her trials ; on one day a heavy sea, which broke over the ship, stove in the cover of the fore hatch. Reports sent in by the captain and by the Government Inspector who was on board the ship during these trial trips were perfectly satisfactory, and both call attention to the fact that it was not necessary to use the pumps at all during any of the rough weather.

Following on these trial runs the Askelad was docked at the

end of November for an official inspection. The concrete hull

was found to be entirely satisfactory, and so on 10th December

1918 the Director of Shipping issued a certificate of seaworthiness

3

34

M.S. STIEti AND M.S. ASKELAD

35

for M.S. Askelad for one year, permitting the ship to engage in North Sea and Baltic trading.

Before the Askelad was completed the author had been engaged in negotiations with the Government with a view to obtaining a permit for a trans- Atlantic voyage. The Minister of Shipping and Commerce requested, however, that the matter be left over until the ship had carried out trials with different cargoes and had crossed the North Sea. Unfortunately, by the

FIG. 16.— M.S. Askelad with Staal-Beton 19, the First Concrete Tug, alongside.

time the various trials had been carried out the owners had fixed up a number of charters for the ship which ruled out the possibility of an Atlantic trip.

The First North Sea Trip. — On llth December 1918 the Askelad sailed from Christiania for Rouen, where she arrived on the 23rd December. The cargo was 6,941 bales of wood pulp, weighing normally 892 tons, but actually more, as the bales had been lying exposed since the month of June and were wet through. On the passage the ship had three days of very stormy weather —

36 SEAGOING AND OTHER CONCRETE SHIPS

a westerly gale with a heavy sea — and a few bales of the deck cargo were washed overboard. This was the first crossing of the North Sea by a concrete ship.

Subsequent Service. — After her first trip across the North Sea the Askelad was engaged trading with all kinds of cargoes to various Norwegian, British, Dutch, and Swedish harbours. Occasional trips were made in the Baltic, where the ice proved troublesome. During the period of speculation in shipping the ship changed hands several times, always at a profit to the last owner. On the conclusion of one of these transactions the new owners asked for a report on the ship from the Captain, who had been with the ship since she was built ; the Captain testified to

FIG. 17. — M.S. AsJc.elad, on trial, llth August 1918.

her general seaworthiness, to her steering qualities, and to her low cost of upkeep. Fig. 18 will indicate that the Askelad was put to hard service ; it shows her at Gravesend with a cargo, including deck load, of wood pulp. The weather on the trip across the North Sea from Gothenburg was very bad and the deck cargo was shifted, bending and tearing up some of the rails and stanchions on the deck. A further indication of the hard service performed by the Askelad is given in Chapter VII.

On 9th September 1919 the Askelad was again docked for an official inspection. Cracks were discovered in four deck beams, and they were chiselled open for inspection ; they were found to be only J"-l" deep, and were merely filled up again with cement. The concrete of the hull was hammered all over,

38 SEAGOING AND OTHER CONCRETE SHIPS

and the bottom in the engine-room was cleaned of oil, scraped, and chiselled open in places for inspection ; there were no signs of the concrete being attacked by oil nor was any sign of weak- ness found. Accordingly a certificate of seaworthiness was issued for a further year.

The following data for Askelad are of interest :

Tons.

Weight of reinforced concrete hull . 733

„ equipment . . . 120

„ machinery . . . 31

Displacement, light . . . 884

Deadweight, freeboard 2' 6J" . . 1,036

Displacement, loaded . . . 1,920

The freeboard of 2' 6J" required by the Director of Shipping is only temporary ; it is 3 J" more than would be required for a steel ship of the same type and dimensions as Askelad. During her official trials the Askelad was actually loaded down to a free- board of 2' 3", and carried a cargo of 1,050 tons ; making an addition for bunkers, fresh water, provisions, etc., the dead- weight with 2' 3" freeboard amounts to about 1,090 tons.

The Askelad is continuously engaged in Baltic, North Sea. and Channel trade, the owners being Messrs. A. I. Langfeldt & Co., Christiansand.

It is difficult to obtain information about the Stier, now known as the Aliakmon, for she was sold to Greece, first to E. D. Papayannis and then to another owner ; at present she is employed in Mediterranean and Red Sea service. The last Norwegian captain of the Stier, who was also for a time captain of the Namsenfjord, has reported very favourably on her, calling attention particularly to the low cost of upkeep.

Summary of Results. — These trial ships have now been con- tinuously in service for fully three years, and the experience gained with them demonstrates that concrete ships possess valuable qualities with which they were not originally credited. Two features are, above all others, necessary for seagoing ships built of any material : Strength and Watertightness. These are of prime importance. All the other qualities — cost, deadweight capacity, speed, running expense, cost of upkeep — are matters of secondary importance, frequently affected by local considerations.

M.S. STIER AND M.S. ASKELAD 39

Until the Stier and the Askelad (together with the Namsen- fjord) proved that the seagoing concrete ship possessed in full measure the above qualities of prime importance they were thought to be impossible of attainment with concrete as the material of construction. A summary of the results of experience as regards the " prime " qualities, and also the " secondary " qualities, is given below.

Strength. — Both ships showed that the strength of the concrete hull was ample. In fact, the author believes that the strength as calculated by his methods could be reduced by 20 per cent, without danger of weakness ; if this were carried out it would put concrete ships on an equality with steel ships in the matter of strength.

Watertightness. — Both ships have proved to be absolutely watertight, and are in this respect superior to wood ships and even to many steel ships.

Cost. M.S. Stier

Concrete hull only, without fittings

of any kind . . . . Kr. 118,000 (£6,500)

All equipment, engines, deck machinery, etc., including in- stallation . . . . Kr. 415,000 (£22,800)

Total cost . . Kr. 533,000 (£29,300)

M.S. Askelad

Concrete hull only, without fittings

of any kind . . . . Kr. 200,000 (£11,000)

AJ1 equipment, engines, deck machinery, etc., including in- stallation . . . . Kr. 493,000 (£27,000)

Total cost . . Kr. 693,000 (£38,000)

Cost per ton of deadweight :

Stier = Kr. 888 (£49) Askelad = Kr. 660 (£36)

The cost of construction varied greatly during the war, and so comparisons with costs for steel and for wood ships can be made only between ships built in the same country. To the best of the author's knowledge the Askelad was the cheapest

40 SEAGOING AND OTHER CONCRETE SHIPS

ship per ton of deadweight for her size and type built in Norway during the period 1917-20.

Deadweight Capacity. — M.S. Stier carries just the deadweight stipulated in the contract, namely 600 tons ; but M.S. Askelad carries 1,050 tons, that is, 5 per cent, more than required by the contract.

It should be remembered that, owing to the increased size of ship as compared with a steel ship of the same deadweight, the concrete ship has a greater cubic capacity per ton of dead- weight than a steel ship.

Speed. — The Stier made 8-6 knots light and 8-0 knots loaded on her trials. Later she showed a better speed. The Askelad made a slightly better speed than the Stier, in spite of her much larger cargo capacity. The Askelad' s speed is equal to that of a steel ship of the same deadweight carrying capacity and engine power. This is contrary to expectation in view of the heavy concrete hull ; but it can be accounted for in part by the smooth- ness of the concrete hull — there are no projecting rivet heads or overlaps of plating — and the reduced skin friction.

Running Expenses and Upkeep. — The same crew and engine power are employed in a concrete ship as in a steel ship of the same cargo capacity, and so there is no difference in the costs of fuel and wages. The trial ships were not painted either inside or out, except with coal tar or antifouling composition on the bottom below the waterline to prevent marine growth. (Experi- ence showed that it was desirable to apply the antifouling com- position direct to the concrete, when the surface became " as hard as glass " and lasted very well.) There was, therefore, a saving in this respect. Further, the low first cost of the ships as com- pared with steel ships resulted in reduced " charges " for interest on capital and for depreciation ; also it was proved that the costs of repairs required by collisions or groundings were very low.

As far as the hulls are concerned there were many details in which improvements could have been effected. But as the slight defects noted were matters of arrangement or design, and were not in any way due to the material of construction, they need not be discussed here. As indicating a defect arising out of the material of construction, it may be mentioned that it was found necessary to fit panelling on the inside walls of concrete deckhouses used for living-rooms.

CHAPTER IV

COMPARISON OF SOME SHIPS BUILT TO CLASS WITH THE AUTHOR'S TRIAL SHIPS

Classification of Concrete Ships — Comparative Values of Cargo Carriers — American Concrete Ships— S.S. Selma and Latham ; S.S. Cape Fear and Sapona.

Classification of Concrete Ships. — Concrete ships were first recognized by classification societies in September 1917, when Lloyd's Register of Shipping approved plans submitted by the author for several types of seagoing concrete motor-ships and barges, which were granted the Class " Al for Scandinavian Coasting Service," "Subject to annual survey" and subject to the notation " Experimental " being made in the Register Book. At about the same time the Norwegian Veritas were preparing their " Provisional Rules for Classification of Concrete Ships." This recognition was of the first importance and was partly due to the success of M.S. Namsenjjord, which a month previously by practical demonstration had furnished indisputable proof of the strength and seaworthiness of the Seagoing Concrete Ship.

Class is to a ship what a report of good name and standing in the community is to a man, and it was very important for the new type of ship to secure even a modified form of class at this early date. About twenty-five million tons of shipping, or one-half of the world's entire tonnage, have been built according to the rules of Lloyd's Register of Shipping, and of the remainder by far the largest portion has been built to class in other institu- tions. Obviously the first rules for classification of concrete ships could only be of provisional character, pending further practical experience, and they were naturally conservative and " on the safe side." On the other hand, economy of materials and labour in construction is of the utmost importance for the future development of concrete ships in competition with steel ships ; by economizing in the material worked into a ship the

41

42 SEAGOING AND OTHER CONCRETE SHIPS

deadweight carrying capacity is increased, and by economizing in labour and materials the first cost is kept down. The problem is, therefore, to determine how little material may be put into a ship without the finished product showing signs of weakness. Having this important point firmly in mind the object of this chapter is to prove that concrete ships can safely be constructed

FIG. 19. — M.S. Patent, 600 tons deadweight, built to Class A 1 "Experimental" in Norwegian Veritas. The ship is partly covered with ice while docking in Christiania.

much lighter — with less expenditure of materials and labour — than as required at present by classification societies.

Comparative Values of Cargo Carriers. — The principal factors determining the commercial value of a cargo carrier are :

Carrying capacity.

Speed.

First cost.

Running expenses.

CONCRETE SHIPS BUILT TO CLASS

43

For ships of the same dimensions and outside shape, and with the same engine power, the speed and running expenses are the same and need not be considered in this comparison. But comparisons of carrying capacities for two different sizes of ships are given below ; they are drawn between trial ships built by the author's firm and similar ships built by the author's firm under the regulations of the Norwegian Veritas Classification Society :

Trial ship Classed ship Stier. Patent.

Trial ship Glassed ship Askelad. Concrete.

Length over-all ....

145'0" 145' 0*

176'0" 176'0"

,, between perpendiculars

140' 0" 140' 0"

170' 0" 170' 0"

Breadth

27' 6" 27' 6"

31' 0" 31' 0"

Depth

15' 9" 15' 9"

19' 0" 19' 0"

Freeboard, loaded .

2' 0£" 2' OJ"

2' 6J" 2' 1\"

Block coefficient

0-77 0-77

0-77 0-77

Cargo capacity, /grain .

33,960 33,960

50,800 50,800

cubic feet \bale

31,180 31,180

46,000 46,000

Displacement in tons, light

565 572

884 940-5

Deadweight in tons

610 603

1,036 972-5

Displacement in tons, loaded

1,175 1,175

1,920 1,913

Reinforcement in hull, tons

58 68

105 120

Concrete in hull, tons

394 391

628 666-5

Weight of hull, tons

452 459

733 786-5

Engines (Bolinder motors), B.H.P. .

320 320

320 320

Singlescrew. Singlescrew.

Twin screw. Twin screw.

Speed in knots, light . .

8-6 9-0

8-6 8-0

,, ,, loaded

8-0 8-25

8-0 7-5

The slight differences in speed are probably due to internal causes in the machinery ; all the ships built by the author's firm have shown increased speed after they have been in service for a time.

The table shows that the trial ships are lighter than ships of exactly the same dimensions and outside shape built to class. And it must be borne in mind that the trial ships have been proved to possess ample strength.

Turning now to the question of first cost, it was found that the unit costs of construction for M.S. Concrete were :

1-0 ton of concrete complete in place and launched . £14 8s. 1-0 ,, reinforcement ,, ,, „ „ . £47 15s.

These unit costs include all materials and labour for wood forms, scaffolding, mixing, handling and placing of concrete, handling and placing of steel, also all overhead charges.

44 SEAGOING AND OTHER CONCRETE SHIPS

They were worked out from the actual cost figures obtained after the construction was finished. The buying prices were, for steel £32 per ton and for Portland cement £1 7s. 6d. per barrel delivered at the yard. The prices are high owing to war conditions.

M.S. Concrete and M.S. Askelad were sister ships in every respect but the detail design of the concrete hulls ; and as shown in the table above, the differences in design involved in the Concrete additional weights of 38-5 tons of concrete and

FIG. 20. — M.S. Concrete, 972-5 tons deadweight, built to Class A 1 " Experi- mental " in the Norwegian Veritas.

15-0 tons of steel. Adopting the unit costs given above the excess first cost of the Concrete as compared with the Askelad amounts to :

38-5 tons of concrete at £14 Ss. = £554

15-0 tons of reinforcement at £47 15s. = £716

Total = £1,270

The cost of M.S. Concrete complete, including engines and equipment, was £46 per ton deadweight ; and, as given above, the deadweight carrying capacity of the Concrete is 63-5 tons

CONCRETE SHIPS BUILT TO CLASS 45

less than that of the Askdad. Expressing the reduction in deadweight in pounds sterling the amount is :

63-5 tons at £46 per ton = £2,921,

which may be taken either as a reduction in selling value or as an increase in first cost. Hence the total increased cost of the Concrete as compared with the Askelad, an increase brought about by the classification requirements embodied in the Concrete amounts to £1,270 + £2,921 = £4,191. The total cost of M.S'. Concrete complete was about £45,000, so that the increased first cost amounts to 9 J per cent, per ton deadweight.

The increased first cost brought about by classification requirements is emphasized if the cost of the naked hull alone is considered ; and the differences between the Concrete and the Askelad are only in the hulls — in machinery and equipment the two ships are exactly alike.

The total cost of the hull of M.S. Concrete was £15,000, which represents £15 8s. per ton deadweight. On this figure the increased first cost corresponding to the reduction in deadweight amounts to 63-5 tons at £15 Ss. per ton, that is, £978. The total increased first cost of the naked hull is, then, £1,270 -f- £978 = £2,248. Hence the concrete hull built to class shows an increased first cost o/15 per cent, as compared with a hull built to the author's design.

It should be mentioned, too, that the Concrete was built exceptionally light because the Norwegian Veritas consented to some modifications in their provisional rules on account of the author's experience in building concrete ships. The difference in favour of the author's design is, therefore, not so pronounced as in the examples given below, which refer to ships built to class by others.

American Concrete Ships. — As further examples for comparison are selected two types of seagoing concrete ships built by the U.S. Shipping Board — Emergency Fleet Corporation — which in January 1918 organized a special Concrete Ship Section to deal with the new type of ship. The author is indebted to the Engineers in charge of this department for various technical particulars of the ships. The information as to the actual carrying capacities of, and experience with, the finished ships was obtained from the American Fuel Oil and Transportation

46 SEAGOING AND OTHER CONCRETE SHIPS

Company, Inc., of New York City, who at present own and operate two of the largest ships. The information as to the costs of the completed ships is taken from the reports of the special " Committee on Reinforced Concrete Barges and Ships," presented to the conventions of the American Concrete Institute at Chicago in 1920 and 1921. The prices are for the present comparison calculated per ton actual deadweight:

All the ships were built to class in the " American Bureau of Shipping," where they received "Experimental Class." The author does not know how far the classification society influenced the designs, but during a visit to Washington at the time the designs were commenced he received the impression that nearly all the details of the concrete hulls were fixed by the designers, while representatives of Lloyd's Register and of the American Bureau of Shipping were consulted on matters of naval archi- tecture.

It is unfortunate that the two types of ships have always been characterized as being respectively of 7, 500 tons deadweight capacity and 3,500 tons deadweight capacity. The original estimates showed considerably smaller figures, and the actual carrying capacities are respectively: 6,380 tons deadweight and 3,078 tons deadweight.

A special light-weight aggregate concrete (see Chapter IX) was used in building these ships, and it is difficult to say whether the increased weights of hulls as compared with the estimated figures were due to increased unit weight per cubic foot of concrete — originally estimated at 107 Ib. per cub. ft. excluding reinforce- ment— or if larger quantities of concrete were used in the hulls than shown on the plans.

The gravel concrete used in the construction of the author's trial ships weighed 140 Ib. per cub. ft. excluding reinforcement. It was to be expected, therefore, that ships built of the special light-weight concrete would have greater deadweight carrying capacity in relation to the weight of hull than the trial ships. But as is shown below, this is not the case ; on the contrary, the concrete hull of M.S. Askelad is much lighter per ton deadweight.

S.S. "Selma" and "Latham"; S.S. ««, Cape Fear" and " Sapona." — The first type of U.S. concrete ship is represented by the oil-tankers S.S. Selma and Latham, owned by the American Fuel Oil and Transportation Company, Inc. They are described

CONCRETE SHIPS BUILT TO CLASS

47

in Chapter VI. The second type is represented by the cargo carriers S.S. Cape Fear and Sapona,, also described (see pp. 72-77) in Chapter VI. These ships have the same freeboards as steel ships of corresponding types ; and in making comparisons of carrying capacity, the same condition should apply to M.S. Askelad. The demand for extra freeboard made by the Nor- wegian Director of Shipping is no longer justified ; Lloyd's Register of Shipping, for example, does not demand extra freeboard for concrete ships as compared with steel ships of the same type. The freeboard for M.S. Askelad should therefore be taken at 2' 3", as has been done in the comparison below.

None of the ships have shown unseaworthiness or lack of strength ; the carrying capacities may, therefore, be compared without any qualification of a technical nature :

Oil-Tankers SeZma and Latham, of light-weight con- crete 420' x 53' X 35' 6", free- board 9' 0*.

Cargo Carriers Cape fear and Sapona, of light- weight concrete 268' X 46' x 28' 3", freeboard 4' 3".

Cargo Carrier Askelad Trial Ship, of gravel concrete ITO'xSl'xIQ'O", freeboard 2' 3*.

Loaded displacement, tons Actual deadweight, tons Deadweight

13,040

6,380

0-489 5,537 1-16

6,310

3,078

0-488 2,843 1-08

1,960 1,076

0-549 733 1-47

Loaded displacement Weight of concrete hull, tons Deadweight

Weight ot concrete hull

The above shows that the relative advantage of the author's design, demonstrated by M.S. Askelad, is 12-J- per cent, increased deadweight in relation to loaded displacement, or 31 per cent, increased deadweight in relation to weight of concrete hull.

It may be argued that the Askelad is a motor-ship, while the others are steamers, with considerably heavier machinery, thus reducing the deadweight. This is true, but then it must be remembered that the American ships are built of light-weight concrete, weighing between 107 and 120 Ib. per cub. ft., while the Askelad is built of ordinary gravel concrete weighing 140 Ib. per cub. ft. Had the same volume of light-weight concrete been used in building the Askelad, the weight of hull would have

120

been 628 X - = 538 tons, a reduction of 90 tons, which would 140

have given the trial ship a corresponding increase of deadweight capacity.

48 SEAGOING AND OTHER CONCRETE SHIPS

The weight of Steel Reinforcement in the author's trial ships was equal to 9| per cent, of the deadweight capacity. In the U.S. Shipping Board's cargo carriers it amounted to 13J per cent, and in the oil-tankers 21 per cent, of the deadweight capacity, or respectively about 36 and 115 per cent, more reinforcement per ton deadweight than in the trial ship.

The amount of concrete used in building the hull of the Askelad was 0-343 cubic yards per ton deadweight, while the amounts in the U.S. Shipping Board's cargo carriers arid oil tankers work out at, respectively, 0-548 cubic yards and 0-457 cubic yards per ton deadweight, assuming that the light weight concrete used in these ships really weighed 120 Ib. per cub. ft. (average), as stated in the final report, 21st January 1921, of the Committee on Concrete Barges and Ships. This shows that respectively 60 and 39 per cent, more concrete was used per ton deadweight to build the hulls of the classified ships than in the author's trial ship.

From Mr. R. J. Wig's paper, "Methods of Construction of Concrete Ships," published in the Proceedings of the Fifteenth Annual Convention of the American Concrete Institute, vol. xv, 1919; pp. 276-7, it appears that the buying price of the chief materials in Hull No. 1715 — an oil-tanker of the same type as the Selma and Latham, built in Mobile, Ala. — came to about £18 105. ($89) per ton of 2,240 Ib. for the steel, and about 13 shillings ($3-12) per barrel of Portland cement delivered at the yard. The corresponding prices of materials used in building the author's trial ships were much higher, viz. about £28 per ton of steel reinforcement and about £1 5s. per barrel of Portland cement. Lumber for making the wood forms and scaffolding was about 20 per cent, cheaper in the construction of the American oil-tanker than in the author's trial ships. But wages were approximately 40 per cent, higher in the United States than in Norway at that date (1918). At present they are prac- tically the same in most trades. It becomes interesting, then, to compare the actual first costs of the ships complete.

In the reports of the Committee on Reinforced Concrete Barges and Ships the prices are stated as being $210-300 per ton deadweight for the cargo ships, and about $200-280 per ton deadweight for the oil-tankers, with the important proviso that these prices refer to the purely nominal deadweight capacities,

CONCRETE SHIPS BUILT TO CLASS 49

and not to the actual capacities. Taking average figures from the above prices, and varying them in accordance with the relation between the nominal deadweight and the actual dead- weight, the costs per ton deadweight are :

Cargo carriers, 3,078 tons deadweight,

similar to Cape Fear and Sapona . . ( $290) £60

Oil-tankers, 6,380 tons deadweight, similar

to Selma and Latham. . . . ($282) £58

Trial ship Askelad, 1,076 tons deadweight £35

In the above considerations, where unfavourable facts as regards carrying capacities and prices have been proved against concrete ships built to class, there has been no desire on the part of the author to criticize the designers, who have worked under the strain of war conditions and have been subject to handi- caps which are not present when private enterprise takes the initiative and assumes the whole risk. Nor has there been any intention of presenting the superior points of the author's design in an extreme manner ; for example, no allowance has been made for the well-known fact that smaller vessels always are more expensive in construction, and therefore command a higher market price per ton deadweight, than larger ships.

More than 60,000 tons deadweight of seagoing concrete ships of the above-mentioned types were actually constructed by the U.S. Shipping Board. Reports on this tonnage will be made known to the profession in all parts of the world ; and it is therefore necessary to point out as strongly as possible that concrete ships have been built successfully at a much lower cost than these, with much lighter weights of hull, and with at least the same, if not greater, strength.

CHAPTER V

CONCRETE TUGS, FLOATING DOCKS, LIGHTSHIPS, AND

LIGHTERS

The First Concrete Tug — The First Concrete Floating Dock — The First Concrete Lightship — Concrete Water-Carrier — Concrete Lighters.

The First Concrete Tug. — There is one type of ship in which cargo capacity is of practically no importance, and in which a heavy weight of hull is an advantage rather than otherwise ; that type is the seagoing or harbour tug, provided with powerful machinery in order to tow or assist other ships, and made strong enough to withstand the rough usage entailed by such service.

A tug must be seaworthy and easy to handle in all circum- stances since she is frequently called upon to put to sea in weather bad enough to keep larger ships in harbour. The commercial value of a tug depends primarily on the type and power of the engines, the fuel consumption, and the equipment for salvage work, etc., while the size of hull is of secondary importance. It may be assumed that the steel hull of an ordinary cargo carrier costs about 40 per cent, of the total cost of the ship, whereas the hull of a tug costs only about 25 per cent, of the total. Accordingly the saving in first cost obtained by the use of concrete for the hull of a tug is relatively less than for a cargo carrier. There are, however, other advantages to be gained by building tugs of concrete ; they may be stated as follows :

1. The towing force is superior to that of a steel tug of equal engine power, particularly if equipped with internal-combustion engines.

2. The life of the engines is increased and repairs and upkeep expenses decreased, due to their being mounted in more rigid hulls less subject to vibration.

3. The first cost, running expenses and costs of repairs, are reduced.

Staal-Beton 19, the first concrete tug, was built by the author's firm for private use, and was neither classed by a Registration

50

FIRST CONCRETE TUG 51

Society nor built under a Government permit ; but the authorities knew of the construction and tacitly agreed, reserving, however, the right to condemn the ship if she did not pass tests of sea- worthiness and strength. Fortunately the trials of the tug were perfectly satisfactory, and she has now given continuous good service for nearly four years. There have not been the smallest repairs carried out on either hull or engine during this time.

CREW'S QUARTERS

FIG. 21. — Tug Staal-Bzton 19. General Arrangement.

In the winter the tug is used for ice- breaking in the harbour at Moss and in the Sound.

Definite proof of the advantages of concrete tugs can come only from experience ; but Staal-Beton 19 is providing that proof, and justifying expectations. With regard to the three points mentioned above :

1. The superior towing force is due to the greater weight and momentum of the concrete hull ; once the initial inertia has been overcome a steadier pull is maintained on the tow-rope in a rough sea. It must be borne in mind that the resistance of the

FIG. 22. — Tug Staal-Beton 19. Ready for Launching, 17th October 1917.

FIG. 23. — Tug Staal-Beton 19. On trial outside Christiania, October 1917.

52

FIRST CONCRETE TUG

53

tug itself is almost negligible in comparison with the resistance on the tow-rope ; and many elements enter into the tow-rope resistance — size and number of ships in tow and their steering qualities, towing speed, currents, wind, length of tow-rope.

FIG. 24. — Tug Staal-Beton 19 breaking ice in the Sound at Moss.

2. After nearly four years of continuous service the engines in Staal-Beton 19 are in perfect condition and have never been repaired nor even had the foundation bolts tightened up. The opinions of marine engineers who have had experience in concrete ships must, until comparative figures can be obtained, be accepted

54 SEAGOING AND OTHER CONCRETE SHIPS

as further testimony in support of the claim advanced for longer life of engines.

3. The costs of the Staal-Beton 19 were, in round figures : hull £800, engines £1,100, equipment and installation £1,300, total £3,200. The cost of the hull was found to be less than ascertained costs of similar steel hulls of the same date.

Fig. 24 shows Staal-Beton 19 breaking ice eight to ten inches thick without difficulty. There has been much discussion in technical circles on the ability of concrete to withstand ice or even sea- water, and various writers have referred, as examples, to badly made concrete piers, etc., disintegrating, or fracturing, with serious consequences. But from a personal examination of Staal-Beton 19 the author can state that after three or four winters in service, partly as an ice-breaker, there are no signs whatever of abrasion or wear on the concrete bows. The hull is in perfect condition everywhere. Neither repair, painting, nor cement brushing has been done on the surface, which is in its original state, without any protection or covering. The author believes that Staal-Beton 19 is a conclusive example of the power of resistance of shipbuilding concrete to the attacks of ice.

The main particulars of Staal-Beton 19 are :

Length between perpendiculars . 48' 0"

Breadth 12' 0"

Depth" r r

Block coefficient . . . . . 0-62

Engines, Bolinder motor . . . 50 B.H.P.

Weight of reinforcement in hull . . 5 tons

,, concrete ,, . 35 „

., equipment . . . . 15 ,,

,, engines . . . . 4 ,,

Light displacement . . . . 59 ,,

The detail design did not present any special difficulties, for there was no need to save weight on the concrete hull and all dimensions could be made ample, namely :

Deck slabs . . . 2J"

Side slabs . . . .3"

„ at bilges . 5"

Bottom slabs . . 3J"

Deck beams . . . 5" X V'

Side frames . . . 5" X 8"

Bottom frames . . . 7" X 10", 12", and 16" Keelson 8" X 12"

FIRST CONCRETE TUG

55

The reinforcement in the deck, side, and bottom slabs con- sists of a " rib " lath near the outside and J" and I" round bars,

W4>N

%

»

(k"^-6"O.C. BENT UP FROM DECK PLAN.

SECTIONS THROUGH BOTTOM AT KEELSON

SECTIONS THROUGH FRAMES.

N

NEAR. BOTH rftCE5

(STAGGERED)

REINFORCEMENT IN F*RAME5 2f BULK1HEADS. FIG. 25. — Tug Staal-Beton 19. Longitudinal Section, Deck, and Frames.

spaced from 3" to 12", staggered near both surfaces. The side frames are reinforced with two J" rods near the inside face and

56 SEAGOING AND OTHER CONCRETE SHIPS

two J" rods near the outside, tied with iV stirrups 5" apart. The bottom frames have the same reinforcement with an additional I" rod near the top. The keelson is reinforced with three £" rods near top and bottom ; it is divided from the fore end of the engine foundation to the stern, forming a shaft tunnel through the hold.

Two oak fenders were originally bolted round the sides, as shown in the illustrations ; but the lower one was removed after the first trials. The stem is protected by a 5" X 6" oak fender faced with a f" steel flat bar. The towing hook, sliding on a steel arc, is attached to the concrete hatch coaming around the engine-room.

The First Concrete Floating Dock. — Many years before seagoing concrete ships became an accomplished fact, the question of constructing floating docks of concrete had been considered by the author, and Fig. 26 shows the first concrete floating dock ever built. It was ordered by A. S. Maritim, yacht and motor- boat builders at Bestum, near Christiania. Since the dock was intended to take only light pleasure craft a lifting capacity of 75 tons was considered sufficient ; during trials before delivery to the owners it lifted 90 tons. After the first year of service Messrs. Maritim, on their own initiative, expressed the following opinion on the dock :

" BESTUM PH. CHKISTIANIA.

10 May 1918.

"It is a pleasure for us to advise you herewith that the concrete floating dock, which you built for us last year, is working just as satisfactorily now as last year, although it has been frozen in the ice during the entire winter ; and the dock has suffered no damage whatsoever, in spite of the fact that the ice was never cut up around the floating dock.

" Respectfully yours,

A. S. MARITIM,

(s.) Alf Bryde, Managing Director."

It should be added that subsequent experience to date has been equally satisfactory, and that the dock every winter is frozen in ice several feet thick, in the Bay of Bestumkilen, near Christiania, where it is stationed. The ice exerts heavy pressure

CONCRETE FLOATING DOCK

57

against the sides ; and it is difficult to say whether steel and wood docks would stand the strain as well, since it is customary to cut the ice around them.

The dimensions of the dock are :

ft. in. Inside breadth . . . . . 25 0

Outside breadth 36 0

Length 80 0

Depth of pontoon . . . . . .46

Total depth of sidewalls . . . . 20 0

£*

Reinforcement. Concrete.

FIG. 26. — Cross Section of the first Concrete Floating Dock.

The pontoon is divided by two longitudinal and two transverse watertight bulkheads into nine compartments, each with a separate pipe-line to the pumping chamber. Access is provided to each compartment by manholes with watertight covers. The bottom frames are spaced 4' apart ; they are of solid concrete 3" thick, provided with manholes and openings near top and bottom for air and water, except in those acting as watertight bulkheads. Fig. 26 shows a cross section of the dock. The longitudinal bulkheads and top and bottom slabs of the pontoon are all 2f" thick. The outer and inner walls of the side wings are 2J" thick, and the top slab 3" thick. The reinforcement is

58 SEAGOING AND OTHER CONCRETE SHIPS

very light. In the slabs it is of lath with J" and -£s" round bars ; the vertical frames are reinforced with f" to f" round bars.

Wood forms were only used in construction of interior frames in wings and pontoon. All the slabs were plastered on " rib " and " Hy. rib " lath except the bottom slab, which was poured directly on the" wood platform supporting the dock.

The pump-house is located on top of one wing, directly over the pumping chamber, where a centrifugal pump capable of emptying the dock in an hour is fitted. A five horse-power electric motor drives the pump, current being supplied from the shore by cable. All the valves are controlled from the pump- house, where a pendulum indicates the direction in which the dock is trimming and so the routine in which the valves should be operated. Four sluice valves on the outside walls of the dock allow of it being filled, and lowered, very rapidly. The pipe-lines are made of concrete, poured around five-inch terra- cotta pipes ; but this construction is heavy and not altogether satisfactory. Iron pipes permit of easier access to bends and connexions. The keel blocks are of wood, four feet apart.

When the plans were being drawn out for the dock there had been no experience accumulated relating to floating craft of concrete other than lighters. It was therefore natural that the design should be "on the safe side," and the dock is con- siderably heavier than it need have been ; the weights are :

Tons.

Reinforcement in hull ... 20

Concrete in hull . . . . .170

Outfit, pumps, and motor ... 20

Light displacement . . . .210

Lifting capacity . . . .90

Loaded displacement . . . 300

The weights of concrete and steel amount, respectively, to about 190 and 22 per cent, of the lifting capacity. These are too high, even for small docks. Designs have been prepared by the author for docks of 4,000 tons and 8,000 tons lifting capacity, and these show the following calculated weights :

4,000 tons 8,000 tons

Lifting Capacity. Lifting Capacity.

Weight of concrete in hull 3,800 tons 7,000 tons

steel 450 800

59

60 SEAGOING AND OTHER CONCRETE SHIPS

In relation to the lifting capacities these weights are, respec- tively, 95 per cent, and 88 per cent, for concrete, and 11 per cent, and 10 per cent* for steel, showing that the cost per ton of lifting capacity decreases as the size of dock increases.

There is perhaps no kind of floating craft more exposed to corrosion than the pontoon of a floating dock, which is con- tinually being filled with, and emptied of, salt water. The numerous interior bulkheads offer extensive surface for attack, and repairs are expensive on account of the difficulty of docking large floating docks. The best material for the construction of such craft is shipbuilding concrete ; the advantages and dis- advantages in comparison to wood or steel can briefly be summed up as follows :

1. The first cost of concrete docks is considerably lower ; broadly speaking, it comes to about 60 to 70 per cent, of steel docks.

2. The upkeep expenses of concrete docks are practically nil ; while those for steel docks are considerable, because of the liability to corrosion inside and out.

3. Repairs are much cheaper for concrete docks. There are no bottom plates to renew, and practically all local damage below the water-line can be repaired by the assistance of divers, without the necessity of docking.

4. Water tightness and fireproofness of concrete docks are superior to those of either steel or wood docks.

The disadvantages of concrete docks are :

1. Increased size for the same lifting capacity. This is important only if space is limited where the dock is to be located, or if the depth of water does not permit of increased depth of pontoon.

Greater liability to local damage from collisions with ships if the concrete surface is not protected by fenders.

Neither of these objections is serious, and local conditions will frequently reduce both to a minimum. The author firmly believes that within the next two or three generations all floating docks will be built of shipbuilding concrete, just as at present excavated dry docks are lined with concrete.

The First Concrete Lightship. — Another stationary type of floating craft which is built to greater advantage of concrete than of steel or wood is the Lightship. The demand for such ships is very limited, particularly in Norway, where deep water

FIRST CONCRETE LIGHTSHIP

61

is found everywhere close in to the shore, and lighthouses erected 011 islands give good service. When the Director of Lighthouses decided to station a lightship at a subaqueous rock in the approach to Christiania — the Ildjemsflu — concrete was selected as the most suitable material, and the author's firm was requested to build the ship. While having the distinction of being the only lightship in Norway and the first ever built of concrete the Ildjernsflu presented no difficulties of design, and details are not of special interest. Fig. 28 shows the ship after two years

Fio. 28. — The first Concrete Lightship — Ildjernsflu — stationed at the approach to Christiania since 1918.

of service ; she was completed in 1917, except for the machinery, and was stationed at the rock in the following year.

The ship has given entirely satisfactory service in spite of exposure to more severe strains than originally anticipated. The Director of Lighthouses has given the author the following information on the matter :

" The rounded form, smooth surface, and flat bottom of the vessel serves its purpose of enabling the lightship to rise on the ice jams, and no ill effects can be seen from the ice. The hull is made rather too short and rose almost on end in rough seas. Since the chain was fixed to a loop through the chain pipes at the bow, a terrific pounding was caused against the ship's

62 SEAGOING AND OTHER CONCRETE SHIPS

bottom when rising on the seas. In November last year during a very severe gale the vessel broke its moorings by snapping both anchor bolts, each 2" diam., fastened in the rock, and drifted in through the harbour, where she was rescued before any damage was done to the concrete hull. When being re- stationed at Ildjernsflu a strong loop of hemp cable was carried around the aft end and attached nearly at the centre of the ship (as on tugs), and the chain was fastened to this loop. The arrangement has been satisfactory, and has greatly eased the heavy pounding from waves on the ship's bottom and the strain on the moorings."

The ship is quite small, having the following dimensions :

ft. in.

Length between perpendiculars . 42 0.

Breadth 18 0

Depth 90

The materials in the hull were 6 tons of reinforcement and 52 tons of concrete, making the total weight of the naked hull 58 tons. Machinery was installed for supplying power and compressed air to the sirens and the light. Cabins were fitted up for the keeper and his family, and large supply tanks for fresh water were built of concrete against the ship's side. The remaining space was taken up by store-rooms for fuel, food, etc. The advantages obtained by building lightships of concrete compared to steel are :

Lower first cost and upkeep, perfect watertightness and better insulation against cold and heat for the crew. A concrete lightship once moored at its station should — barring severe accidents — never need to be removed for docking or survey. The Ildjernsflu is painted a bright red, and most ships passing by probably have no idea that she is built of concrete.

Concrete Water Carrier. — This ship is also very small, the dimensions being 60' 0" X 18' 0" X 7' 6", and she carries about 75 tons of fresh water. The engine is a 38 H.P. Scandia motor, giving a speed of 5 miles an hour. The hold is divided up by portable wood bulkheads longitudinally and transversely to prevent the water moving about too freely. When these are taken away the boat is used to carry ordinary cargo.

As regards carrying water, it will probably be admitted that

CONCRETE WATER CARRIER

63

concrete is much cleaner, and easier to keep clean, than either wood or steel ; and it should be recorded that no influx of salt water has ever affected the freshwater cargo in Bjorvika, although at the time of her construction many engineers had serious doubts as to the possibility of making concrete perfectly watertight.

Concrete Lighters. —In Chapter I it has been stated that, contrary to an almost universal impression, shipbuilding con- crete is not utilized to its best advantage when used for con- structing lighters. And yet a considerable number of such craft have been built in different countries at various periods,

FIG. 29. — Concrete Water Carrier Bjorvika, built for harbour service in 1917.

dating back twenty-five years or more. It is even claimed that a small row-boat of concrete was built in 1854 by Lambot, and exhibited by him at the World's Fair in Paris that year. The author has given the problem considerable attention during the past twelve or fourteen years, and has built numerous lighters of different types and sizes. The first one was constructed in Manilla, the others in Norway.

During the past few years many misleading and incorrect statements have appeared in the technical and public press about concrete lighters. Frequently the writers have been entirely ignorant of the subject : some have been theoretical enthusiasts, whose designs on paper were the sole foundation for

64 SEAGOING AND OTHER CONCRETE SHIPS

their extravagant claims ; others have condemned the whole idea of using concrete for any kind of floating craft, merely from unsatisfactory experience with perhaps one or two concrete lighters.

Conditions differ greatly in different countries and there is no material of construction, wood, steel, or concrete, which is best under all conditions of service. On the large rivers in the forest regions of Russia and Siberia wood lighters — sometimes of a temporary, raft-like character — are built at a trifling cost to transport native produce down the river, where they are

FIG. 30.— Standard type of 100 tons deadweight Concrete Lighter. The first built in Norway, August 1916.

knocked apart and the materials sold at the end of the journey. Obviously in such a trade neither steel nor concrete can compete with wood. On the inland canals of Europe and America, where locks and waterways are frequently limited in dimensions, and the lighters always move in entirely enclosed waters, steel boats of extremely light construction are the most efficient cargo carriers, owing to their very light weight and draught. Further, in the districts intersected by these canals steel lighters can be built very cheaply. Where there is plenty of water, and the cargoes are light in relation to their bulk, like lumber, for example, and conditions do not impose frequent collisions with docks,

CONCRETE LIGHTERS AND BARGES

65

concrete lighters may be most suitable on account of their low first cost and upkeep expenses.

Concrete lighters have given also good harbour service. The author's firm constructed in 1916 two lighters of the type illus- trated in Fig. 30 for A.S. Laegterkompaniet, the largest lighter owners in Christiania. These owners have testified (in a letter dated 21st February 1917) to the good service given by these

FIG. 31. — Open Concrete Barge, 60 tons deadweight, for river and harbour

service.

two lighters ; they have recorded that the lighters have been frozen up for several weeks, and that they have been towed through the ice in Christiania harbour, without apparently suffering any damage.

These standard type lighters are of light construction, the average thickness of the deck, side, and bottom slabs being 2£ inches. The frames are 9" X 4", spaced 5 feet apart ; the transverse frame at amidships is heavier than the others and is carried across the hatch in an arc, forming a support for the 5

66 SEAGOING AND OTHER CONCRETE SHIPS

hatch covers. There are two transverse bulkheads, 2 inches thick, having a cargo hold between them 48' 0" long ; the cargo hatch is 40' 0" X 12' 6". Wood centring was used only for the platform on which the bottom rested, and for the interior frames ; the concrete in the side and deck slabs was plastered on a stiff metal lath to which was secured additional reinforcement in the form of round bars.

The author's firm has built also some 250-ton lighters of similar design to the 100-ton lighter, and a very small type of open river barge, shaped like a box, with a pointed stem ; one of the latter is illustrated in Fig. 31. This figure shows also a couple of concrete mooring buoys, of which several have been built ; they are giving satisfactory service and have not been pumped out since they were placed in position four or five years ago.

The particulars of the lighters and the barge are :

250-ton 100-ton 60-ton

Lighter. Lighter. Barge.

Length between perpendiculars . 80' 0" 64' 0" 47' 0"

Breadth (maximum) . . .20' 0" IS' 6" 15' 0" Depth . . . . .11'$* 7' 6" 5' 6"

Weight of reinforcement, tons .10 5 2

concrete „ . 122 49 25

hull „ . 132 54 27

outfit 13 63

Light displacement ,, .145 60 30

Deadweight „ .250 100 54

Loaded displacement „ .395 160 84

Block coefficient .... 0*84 0*80 0'935

Cost in 1916 .... £1,750 £450 £260

More than a dozen lighters of these types have been built and are now in service in various parts of Norway and Sweden.

The various elements involved in a comparison between concrete lighters and steel or wood lighters are discussed below :

First cost is nearly always highest for steel and lowest for wood, with concrete between ; but in localities where wood for shipbuilding purposes is difficult to obtain concrete may prove cheaper than wood.

Upkeep expenses are larger for both steel and wood.

Repairs cost more for both steel and wood ; but since concrete

CONCRETE LIGHTERS AND BARGES 67

is more liable to local damage on the surface than steel or wood, the greater frequency of repairs may even up the balance.

The lifetime will probably be longer for concrete than for either steel or wood, but there is not a long enough experience of concrete craft to provide data for a definite conclusion ; it should, however, certainly be the case in tropical countries, where wood hulls are liable to destruction by insects and steel hulls to destruction from corrosion.

Strength is a matter of design and can be made sufficient with any of the materials of construction.

Cargo capacity in cubic feet per ton of deadweight carried is greater for concrete than for steel or wood. This is due to the greater weight of concrete, requiring the provision of a larger hull for a given deadweight carrying capacity. This is an advantage if light cargoes are to be carried, but a disadvantage if dimensions are restricted, as by locks, etc.

Speed. — Experience has shown that in spite of the greater weight of concrete lighters they do not require appreciably greater towing power than steel or wood lighters of equal dead- weight capacity.

Watertightness is a necessity for all lighters ; with the passage of years wood lighters often open up at the seams and become leaky, whereas concrete lighters generally become perfectly tight, even if they leak slightly immediately after being launched.

The fire-resisting qualities of concrete are better than those of steel or wood.

Liability to marine growth is about the same for the three materials ; but concrete is easier to clean because of the absence of rivets or seams.

The time required for construction is roughly the same for the three materials ; but in out-of-the-way places concrete lighters are easier to construct because less equipment and skilled labour are required, and all the materials are easily handled without the use of cranes or machinery.

CHAPTER VI SHIPS BUILT IN THE UNITED STATES

The Faith — U.S. Shipping Board Investigations — The First U.S. Standard Concrete Ship — Ships actually completed — Oil-Tankers — Oil-Storage generally.

The " Faith." — One ship stands out prominently in the develop- ment of seagoing concrete ships, the Faith, built by the San Francisco Shipbuilding Co. at Redwood City, Cal. This was the first seagoing ship built in America of the new material ; and at the time of her completion she was by far the largest concrete ship in the world. To Mr. W. Leslie Comyn, president of the shipbuilding company, and to Messrs. Allan MacDonald and Victor Poss, the engineers who designed the ship, great credit is due for their splendid and successful achievement.

Construction was started in September 1917 on the meadow bank of a narrow estuary, where the ship was launched on March 14th, 1918. A couple of construction sheds were all that remained to indicate that a large ship had been constructed in the place ; the usual heavy cranes and equipment of a shipyard were conspicuous only by their absence.

The main particulars of the Faith are :

Length between perpendiculars . . 320' 0"

Breadth 44' 6"

Depth 3<y 0"

Freeboard, loaded . . . 6' 0"

Load displacement .... 8, 150 tons Block coefficient . . . .0-835

Engines, triple expansion type . . 1,700 I.H.P.

Speed ...... about 10 knots

The designed deadweight capacity was 5,000 tons ; and it has been stated that the actual deadweight capacity is 4,500 tons. The latter figure would correspond to a " light " weight of 3,650 tons and a concrete hull weight of 2,700 tons. On the other

68

SHIPS BUILT IN THE UNITED STATES

69

hand, it has been stated also that the hull includes 520 tons of reinforcement and 1,500 cubic yards of concrete ; at 138 Ib. per cubic foot the weight of concrete would be 2,495 tons, which with the steel would give a hull weight of 3,015 tons and a deadweight capacity of 4,185 tons, and not 4,500 tons as given above. The author does not know which of these deadweight figures is correct. But according as the higher or lower figure is taken the relation of the deadweight capacity to the loaded

FIG. 32. — S.S. Faith. Ready for the launch.

displacement is 55-2 per cent, or 51-3 per cent. Both of these percentages are higher than those obtained in the concrete ships built by the U.S. Shipping Board, even though these were built of light-weight concrete.

The estimated cost of the Faith was $300,000 to $400,000; the actual cost was $750,000.

The Faith is constructed with longitudinal framing between heavy transverse frames spaced 16 feet apart. Deformed bars provided'with lugs were used in order to obtain the best possible

70 SEAGOING AND OTHER CONCRETE SHIPS

band between concrete and steel. The side and bottom slabs are 4" to 4J" thick, reinforced diagonally ; the shelter deck slabs are 3" to 3J" thick. The poop, bridge, forecastle, and main decks are of wood, as is also the ceiling on the floors in the cargo holds. There are seven watertight bulkheads of concrete.

The Faith was launched six weeks after the pouring of the concrete was started, and the builders were so satisfied with the launch that it was considered unnecessary to give the hull a trans- Pacific towing trial as originally intended. The installa- tion of the machinery was therefore started right away, and a couple of months later the ship was completed and ready for her first trip. She made journeys with different cargoes to Vancouver, Tacoma, Honolulu, Chile, and through the Panama Canal to New York, arriving there in November 1918, after having travelled some 12,000 to 15,000 miles. While in New York the ship was inspected by many engineers and shipping men, who all declared her to be perfectly sound and seaworthy. Some minor details on deck might have been improved, such as the attachment of the wood deckhouses and the winches. A slight leakage of fuel oil from the concrete tank forward of the engine-room bulkhead had occurred as the result of a light oil being used on one journey ; this was remedied by steaming out the tank and covering the inner surface with spar varnish, and it is understood that no further percolation of oil has taken place. The ship was perfectly watertight ; and there was no sweating in the holds. In rough seas she exhibited the easy movements and lack of machinery vibration which are characteristic of concrete ships. It has been stated that cracks have occurred in the concrete deck as the result of longitudinal strain ; if this were so, they seem to have been of minor importance and only in the upper surface, which now is covered with an inch of asphalt.

During the spring of 1919 the Faith arrived in London, being the first concrete ship to cross the Atlantic. Subsequently, the ship was sold to Italian owners and is at present trading in European waters.

Mr. W. Leslie Comyn, builder and first owner of the Faith, whose energy, courage, and financial backing made the con- struction possible, is a business man, not an engineer ; but he knew that wood ships built of green lumber were foredoomed to failure, and he realized the difficulties involved in the building

SHIPS BUILT IN THE UNITED STATES

71

of steel ships on the West Coast, separated from the rolling mills by almost the width of a continent whose railways were suffering from war-time conditions. When, however, he proposed the construction of concrete ships to the U.S. Shipping Board he received at first no support. There is no need to dwell on the difficulties he encountered. But it may be mentioned that in 1920 the American Concrete Institute awarded him a special medal for his meritorious work.

FIG. 33. — S.S. Faith going through the Panama Canal.

U.S. Shipping Board Investigations. — The U.S. Shipping Board was organized to meet the enormous demand for tonnage at the time when America entered the war. The large majority of the ships constructed by the Board were of steel, but several hundred wood ships and a dozen concrete ships were also constructed.

During the summer of 1917 numerous suggestions as to the building of concrete ships were made to the Board by the author through his brother, Hermann Fougner, C.E., and others, but with no immediate results. In October, after the Namsenfjord had demonstrated by actual trials the possibilities of the seagoing concrete ship, the author crossed to the United States and had

72 SEAGOING AND OTHER CONCRETE SHIPS

several conferences with leading members of the Board ; it was suggested that the Board should purchase a concrete ship then under construction in Norway by the author's firm. By the new year the suggestions and conferences had borne fruit to the extent that it was decided to institute a concrete ship section to investigate the whole position in regard to concrete ships.

The Concrete Ship Section of the Board was organized by Mr. R. J. Wig, who was first the Chief Engineer and latterly the Head ; it was staffed by expert concrete engineers from all over the country. Very elaborate theoretical investigations were carried out, and also extensive laboratory experiments and tests of structural details of the proposed ships. The tests were of a magnitude beyond the resources of the private concrete shipbuilder. For example, a 5,000-ton machine was used for testing full-size specimens of bottom frames ; particulars of experiments and tests can be obtained in " Structural Laboratory Investigations in Reinforced Concrete made by Concrete Ship Section, Emergency Fleet Corporation," by Mr. W. A. Slater, in the Proceedings of the American Concrete Institute for 1919.

Following upon the investigations and tests a " Special Report ... on the Advisability of Constructing Concrete Ships " was presented by Mr. Wig to Mr. E. N. Hurley, the Chairman of the Board, on 5th April 1918. In the Report it was stated that the concrete ship could be built structurally equal to any steel ship ; that the concrete ship would be durable for several years ; that the cost of the concrete ship complete would be from $100 to $125 per ton deadweight ; that the construction of concrete hulls would not interfere with the existing Shipping Board programme for the building of steel and wood ships ; and that, if operations were started at once, approximately 560,000 deadweight tons of concrete ships could be completed by the end of 1918.

On 9th April 1918 the Chairman of the Shipping Board sub- mitted to the Treasury an estimate of appropriation covering an emergency fund for concrete ships, and on 12th April it was approved and authorized by President Wilson.

The First U.S. Standard Concrete Ship. — Appended to the report of 5th April 1918 was a description of the proposed ship whose plans had been fully worked out by the Concrete Ship Section, and which provided the basis for the estimate of the tonnage which could be constructed by the end of 1918. The

SHIPS BUILT IN THE UNITED STATES

73

main particulars of the design, and the estimated weights, were given as :

Length between perpendiculars . . 268' 0"

Breadth 46' 0"

Depth ....... 28' 3"

Draught ...... 23' 6"

Weight of hull ..... 2,500 tons

„ equipment and outfit . . 191 „ propelling machinery . . 206 ,, Margin . . . . . 75 „

Light displacement .... 2,972 tons

Weight of reserve feed . . . 80

ordnance . . . . 23 „

fuel 300 „

stores 40 „

cargo . . . 2,760 „

Total deadweight .... 3,203 „

Load displacement . . . 6,175 „

Deadweight Load displacement

The Cape Fear and Sapona, referred to in Chapter IV, p. 46, are of this class ; accordingly the actual deadweight capacity worked out at about 3,078 tons, and the cost per ton deadweight at about $290.

The general arrangement, including number and positions of bulkheads, was very similar to that of the wood standard ship of the same dimensions ; the propelling machinery also was similar to that of the wood standard ship.

Calculations of the structural strength gave the following results :

Condition of Ship.

Maximum Bending Moment.

Maximum Fibre Stress.

Maximum Fibre Stress in Concrete.

Deck Reinforcement.

Keel Reinforcement .

ft. tons

tons/in.2 ten.

tons/in.2 comp.

lb/in.2

Ship without cargo, hogging

25,175

5-53

2-80

728

Ship fully loaded, hogging .

37,000

5-63

2-95

766

comp.

ten.

Ship without cargo, sagging

14,400

2-63

1-28

270

Ship light but with cargo

in forward hold for trim-

ming purposes, sagging .

11,960

•2-19

1-07

210

Ship fully loaded, sagging .

9,400

1-72

0-84

70

74 SEAGOING AND OTHER CONCRETE SHIPS

For a steel ship of the same size and type the maximum tensile stress, for the conditions for calculation used above, would be from 5 to 8 tons per square inch. In addition to the " structural " stress there is a stress due to bending of the plating between frames due to water-pressure ; this local stress is seldom taken into account in steel ships, but was calculated for the 268 feet concrete ship and was found to add. about 3 tons per square inch to the tensile stress in the reinforcement.

The strength of the transverse frames was investigated for various conditions of loading and various immersions of the ship,

FIG. 34. — S.S. Polias. Built for the U.S. Shipping Board by the Fougner Con crete Shipbuilding Co., New York, October 1919.

upright and inclined. The maximum permissible stress in the steel was taken at 15,000 Ib. per square inch.

The bulkheads were designed to carry a head of water up to the deck on either side. For the collision bulkhead and the aft peak bulkhead the maximum permissible stresses were taken at 1,500 Ib. per square inch compression on concrete and 16,000 Ib. per square inch tension on steel ; for the engine-room bulkheads the maximum permissible stress on the steel was taken to be 20,000 Ib. per square inch. In the design of bulkheads for steel ships it is common practice to use a permissible stress of 22,000 to 23,000 Ib. per square inch.

SHIPS BUILT IN THE UNITED STATES

75

The deck was designed to carry a five feet head of water ; this was in excess of the loading assumed for the steel standard ships then being built for the Board.

Ships actually Completed. — The policy of the Shipping Board involved the concrete- ship- builder preparing his yard before commencing actual ship construction. As things happened, this was not a sound policy. There was a large number of yards turning out wood ships, ships whose success was, at that time, problematical and whose failure is, now, definite. It would have

JMfe

FIG, 35,— S.S. Selma.

Built for the U.S. Shipping Board by the Fred. T. Ley Co., Mobile, Ala.

been reasonable to place one or two of these yards at the disposal of the Concrete Ship Section so that one or two trial ships could have been built and put through tests at a very early stage in the programme, with decided benefits to the programme as a whole in the way of indicating possible economies of time and money. Had the Concrete Ship Programme not been kept entirely as a thing apart from the Wood Ship Programme it is possible that by the spring of 1919 a large fleet of seagoing concrete ships would have been ready for service, instead of, as was actually the case, the first ship being launched in December

76 SEAGOING AND OTHER CONCRETE SHIPS

1918 and completed in October 1919. The estimate of the Concrete Ship Section was that, without interfering with the programme of wood ship construction, about 560,000 deadweight tons could be constructed by the end o"f 1918.

The Armistice brought the Government shipbuilding pro- gramme to a sudden termination. Only ships whose construction had reached a certain stage were completed ; the result was that the Concrete Ship Programme was reduced to the following twelve ships :

Name. Dimensions. Deadweight.

Tons.

Polias, cargo carrier . . 268' 0" X 46' 0" X 26' 6" 2,460

Atlantus „ . . 250' 0" X 43' 6" X 26' 9" 2,542

Cape Fear „ . . 268' 0" X 46' 0" X 28' 3" 3,078

Sapona „ .

Selma, oil-tanker . ' . 420' 0" X 54' 0" X 36' 0" 6,380

Latham „ .

Palo Alto „ .

Peralta „ .

Cuyamaca „

SanPasqual,,

Dinsmore „ .

With the exception of the Polias and Atlantus the ships completed were all of the standard type. Most of the ships were of the so-called 7,500-ton type. This type was designed after the 3,500-ton type, it having been decided that the latter type was too small ; the change in policy involved a delay in the building programme. The cargo carriers were delivered between October 1919 and January 1920, and the oil-tankers, except the Moffit and Dinsmore, between May and September 1920.

The Polias was constructed by the Fougner Shipbuilding Co. (incorporated by the author) of New York ; the order was given by the Concrete Ship Section in February 1918, and was to be followed by five more. The design was prepared by the Fougner Co., but was revised in various details by the Shipping Board and the structural design was subject to the requirements of Lloyd's Register ; it was based on the design of the wood standard ship, so that similar machinery, equipment, and fittings could be used.

SHIPS BUILT IN THE UNITED STATES 77

The superstructure and all decks were of concrete, and the whole design was worked out more heavily in details than was originally anticipated. There is no doubt that much steel and concrete could have been saved in the frames, longitudinals, and super- structure. The average thicknesses of the shell and deck slabs were, respectively, 5" and 4|" ; these do not appear excessive for a ship of the size, but would probably have been adequate in association with a five feet frame-spacing instead of the four feet spacing actually used. The side frames were 8" thick by 24" average depth. The deck was carried by two continuous girders forming the hatch coamings and supported by widely spaced pillars of 9" diameter steel pipe filled with concrete.

The side slabs were reinforced with two layers of J" square bars, arranged diagonally in both directions. The deck and bottom slabs had a layer of f" square bars diagonally each way in the middle, also the heavy longitudinal reinforcement, of 1" square bars, near the upper and lower faces. The frames were reinforced with 1J" square bars near the inner and outer faces and the keelsons with 1J" square bars near the tops.

Had " light-weight " concrete, as described in Chapter IX, been used about 400 tons of weight of concrete would have been saved, and the deadweight carrying capacity correspondingly increased. A further saving of weight could have been obtained by making the keelsons and bottom frames of T section, instead of rectangular section ; but this saving would have been achieved at the expense of increased cost for centring. Engineering News- Record, for 12th December 1918, contains considerable detailed information on the structure of the Polias ; but the ship's name is not given as she had not then been named.

The Polias was run on a reef off Rockport, Maine, early in 1920 and has been abandoned. Particulars of the damage to the ship are given in Chapter VII.

The Cape Fear was sunk in a collision with S.S. City of Atlanta in Narragansett Bay during October 1920 ; she lies in about 125 fathoms between Castle Hill and Rose Island.

Hence there remain, in all, not more than ten seagoing concrete ships of the Shipping Board Programme ; there may, in fact, only be eight ships, for there is no definite information as to the completion of the Moffit and Dinsmore, both of which had accidents during launching.

78 SEAGOING AND OTHER CONCRETE SHIPS

The Selma and Latham have been in the service of the American Fuel Oil and Transportation Co., who informed the author, in July and October 1920, that they have been fine steady ships in rough weather, entirely oil-proof and watertight. Both ships have grounded against the harbour jetty at Tampico, and the owners estimate that the costs of the repairs were only half what would have been incurred by steel ships.

The Atlantus was until recently chartered by the Clyde Steamship Co., who found her entirely seaworthy, but rather heavy ; she was not remunerative in the service where she was engaged, due principally to the drop in freight rates and the high operating expenses. She is now laid up, as are also the Sapona and Peralta, together with hundreds of steel ships owned by the Shipping Board.

The Palo Alto is believed to be chartered by the American Fuel Oil and Transportation Co., and the Cuyamaca and San Pasqual by the France and Canada Oil Transportation Co.

From the above brief record it is evident that very little practical experience has been gained from these concrete ships ; and it remains for the future to prove their merits. But the author desires to point out that even experience of these ships will not be by any means decisive for the future of concrete ships. These ships constitute only a link in the chain of develop- ment, nothing more. Had circumstances permitted their designers and builders to revise and improve on subsequent ships, there is no doubt that the subsequent ships would have been better ships, both cheaper and lighter.

Further information on the U. S. Concrete Ships, also informa- tion on the yards in which they were built, can be obtained in the Proceedings of the American Concrete Institute for 1919. For example, Mr. J. Glaettli, jun., has contributed " Problems in the Design of Reinforced Concrete Ships " ; Mr. R. J. Wig has written on " Methods of Construction of Concrete Ships " ; and Mr. A. L. Bush, who succeeded Mr. Wig as head of the Concrete Ship Section of the Shipping Board, has contributed " Layout and Equipment of the Government Concrete Ship- yards." These papers were, however, written before any of the ships were completed, and estimates of carrying capacities, costs, etc., given in them require modification to bring them into accordance with actual facts.

BUILT IN THE UNITED STATES 70

Oil-tankers. — The first concrete oil-carriers ever constructed were built in the spring of 1918 by the Fougner Concrete Ship- building Co. for the Standard Oil Co., of New York. In all six ships were built, comprising three harbour barges for carrying oil in bulk in the hull compartments and in cases on deck, two canal barges, one to carry oil in bulk and the other to carry asphalt in cylindrical steel tanks, and a hulk for the storage of oil in cases and in barrels. Investigations during the last few years have shown that the common grades of fuel oils can be retained safely in concrete vessels, without leakage or injury to the con- crete ; but before carrying out the contract with the Standard Oil Co. the Fougner Co. made numerous experiments in order to confirm, and extend, the then available information on the matter.

The first harbour barge, Socony 200, is 98' 0" by 31' 0" by 9' 6" and carries about 400 tons deadweight ; the general arrange- ment is shown in Fig. 36.

Socony 200 is of similar type to the ordinary New York Harbour deck scow. The hull is divided internally by four transverse and three longitudinal bulkheads, all oiltight except the centre longitudinal bulkhead, which is pierced by large openings. Only the three central compartments are arranged for the carriage of oil. The deck is of concrete, covered with spruce flooring laid on nailing strips. Manholes are provided for access to all compartments. Equipment for towing and for handling cargo, the quarters for the crew, and the deck fittings, etc., are the same as usually arranged by the Standard Oil Co. on barges of the size and type. The sides of the barge are pro- tected by three horizontal fenders, 6" by 8", of white oak ; between these, at the ends and the most exposed places on the sides, are fitted solid planking of pine, as can be seen on Fig. 37. The pump-room is aft under the deckhouse.

The two other harbour barges are of the same type as Socony 200, but are each of 700 tons deadweight.

The canal barges Socony 201 and Socony 50 are 132' 0" by 12' 0" by 12' 4", and carry about 550 tons deadweight each. The first was launched in November 1918 and the second in January 1919. Both have the pump-room amidships and the crew's quarters aft. Socony 201, which carries oil in bulk in the hull, is divided by six transverse and one longitudinal bulkhead ;

'«#

_-TQ.—

o.

>

z o

s

2 §

0)

O

+3

W)

1 1

TS

a

^

O

7

Z

2 B

o °

80

SHIPS BUILT IN THE UNITED STATES

81

access to the compartments is obtained through trunks on the deck. Outside fenders are fitted as on Socony 200. The equip- ment and pumping plant were supplied by the Standard Oil Co. These barges have given satisfactory service ; but they have been subject to minor damages through rough handling. There is no kind of craft which receives harder usage than the New York Harbour barge, which is constantly bumping against other barges, and against tugs and wharves. The author is of the

FIG. ST.— Socony 200. The Launch, July 1918.

opinion that concrete is not at present suitable for such craft ; but the great advantage of the fire-resisting property of concrete, and the easy upkeep of the tanks, are points in favour of the use of concrete for oil barges.

The oil storage hulk, whose general arrangement is shown in Fig. 39, is 152' 9" by 35' 8" by 13' 3", and carries 1,200 tons of oil in cases or barrels on deck in the concrete superstructure. The hull is divided into watertight compartments by four transverse bulkheads and one longitudinal bulkhead, with additional subdivision in the ends. Two open longitudinal 6

82 SEAGOING AND OTHER CONCRETE SHIPS

bulkheads are fitted for structural reasons. The average thickness of the sides, bottom, and deck is 3 inches. The walls and roof of deckhouse are 2 J" thick ; a concrete fire wall, 4" thick, encloses the deckhouse to a height of 27 inches. Above the fire wall are fireproof sliding doors and windows. The fittings are all of the Standard Oil Co.'s usual type. Fenders are fitted as on the barges.

The oil storage hulk shown in Fig. 39 has been inspected by a member of the Special Committee on Concrete Ships and Barges

FIG. 38. — Socony 201. 550 tons deadweight.

of the American Concrete Institute ; see report dated 21st January 1921. .It was found that the concrete was in excellent condition ; some cracks were discernible, but there was practically no leakage, and the barge appeared to be doing its work satisfactorily.

Oil Storage generally. — Until recently there was no great demand for oil stations, for the good reason that ships burning oil were few and far between. Before the war less than one per C3nt. of the world's mercantile tonnage used oil fuel. The case is different now. According to Lloyd's Register, in 1919-20 eighteen per cent, of the world's mercantile tonnage used oil fuel, either under boilers or in internal combustion engines ;

tc

!c

z

Mp

5

5

£L

QL

/^°i

F\

POO

— '

— T— I" 1

1

O

1

j

o L !

-»- ^Q

r "

Q 2H

"

£

1 0

,__.

i

, z

£

O I

^ 3

...^_

— r—

b""!"

o

0

o

(1 *

u ±

— — L •!

\^_Vi

^

LLJ

D

z

O

•a

Z *'• O " h ^

.

0

84 SEAGOING AND OTHER CONCRETE SHIPS

in 1918-19 the percentage of tonnage using oil fuel was twelve. Of the total tonnage classed in 1919-20, 47 per cent, was arranged for the use of oil fuel.

In view of the development in the use of oil fuel it is obvious that oil bunkering stations will be required in most ports ; and owing to the great value of harbour frontage the cost of shore stations with land tanks will generally be prohibitive. Hence, the author firmly believes that within the next ten years hundreds of floating oil stations of the type shown in Fig. 39 will be in service. For this type of craft shipbuilding concrete is un- questionably a better material of construction than any other known to-day ; concrete shows up to advantage on the scores of cheapness, durability, low upkeep expenses, and safety against fire risks. For oil hulks the question of fire risk is of the utmost importance ; it requires no great imagination to conceive what would happen if hundreds of tons of flaming oil were to float about in a harbour. Neither wood nor steel is fireproof, but concrete is. And by storing bulk oil only in inside compartments additional safety against the risk of burning oil escaping is obtained.

Craft of the type shown in Fig. 39 can be almost box-like in exterior shape and, with intelligent supervision, can be constructed by local labour anywhere in the world ; and they will generally be built most cheaply at, or close to, the place where they are to be stationed. Sand, gravel, and in most countries Portland cement and some lumber, can be procured locally or shipped only from a short distance. The steel will generally be the most difficult element to obtain, but that amounts to only about a fourth of the steel required to build a similar ship of steel.

Concrete oil containers on land may be somewhat outside the scope of this work, but many features are closely related to those of the floating oil-tankers. The author is aware that the cylindrical steel tanks above ground frequently used by oil companies may in certain localities be quite as cheap in first cost as concrete, or even cheaper. But the matter does not end there. Very often it is necessary to arrange the fuel oil reservoir under ground. Concrete is then better suited to resist hydrostatic or earth pressures, has greater weight against upward pressure, is a better non-conductor of heat and cold, lightning and electrolysis, does not rust, and is fireproof. Most of these points are also in favour of concrete oil tanks above ground.

SHIPS BUILT IN THE UNITED STATES 85

In this connexion some interesting papers are published in the Proceedings of the American Concrete Institute, vol. xv. 1919 : " The Design of Reinforced Concrete Fuel-Oil Reservoirs," by H. B. Andrews ; " Tests of Concrete Tanks for Oil Storage," by J. C. Pearson and G. A. Smith ; " The Fire Hazard of Fuel Oil," by J. W. Lord.

CHAPTER VII DAMAGES AND REPAIRS

M.S. Askelad — M.S. Nicanor— M.S. Stier—S.S. Polios.

M.S. Askelad. — At 7 a.m. on 16th January 1919 the Askelad left Havre for the North and, following instructions from the French naval authorities, steered a course close to the shore at low speed. There was a strong wind, with a heavy sea. Full speed ahead was ordered at midday, and during the afternoon Fecamp, P. Valery, St. Valery, Pt. d'Ailley, P. Treports Pirere, and Cayeux were passed. At 9.15 p.m., in a strong wind with rain and a heavy sea, the ship struck a sandbank in the estuary of the River Somme, about midway between Cayeux and Pte. de St. Quentin ; the place where the ship struck is marked " A " in Fig. 40. The helm was put hard over in an attempt to get the ship out to sea ; but the ship was driven inshore, coming to rest eventually in the position marked " B " in Fig. 40, about four miles from " A." While being driven ashore the ship bumped violently at every heave of the sea, and this continued after she was brought up on the beach. The shocks were so severe that footing could not be kept on the bridge. Heavy seas swept the ship, and the starboard lifeboat and the dinghy were carried away. After a time the shocks became less violent and by about 11 p.m. they had died away. Shortly after it was found that the ship was practically high and dry at the bow, and a member of the crew who had been sent out to investigate reported that it was possible to get to land in about half an hour, and that it was necessary to wade waist-deep in only a few places on the way. The crew, therefore, took the opportunity of getting ashore with their belongings, also some food and water, as they were afraid that the ship would break up at the next high tide. In a report to the owners, dated 18th January, the Captain stated that the ship was still bumping violently at high tide,

86

DAMAGES AND REPAIRS

87

though the weather had moderated a bit ; in his report was the remark " Strange to say, the ship is quite tight." During the

'•a

II 31

i

.

O oj

^ I

l-s

o t

0

day of the 17th the Captain had made arrangements for a tug to come from St. Valery when the weather moderated ; and on the forenoon of the 18th an attempt was duly made to get the ship off, tug and ship's engines working together. But the

88 SEAGOING AND OTHER CONCRETE SHIPS

attempt was unsuccessful. The tides were falling and the Captain was of the opinion that there was no use in making any further attempt at refloating before the beginning of February, . . . "if the ship holds together." " Should another gale spring up there is every probability that the ship will break to pieces, although she seems to be strong as a rock." (The passages quoted are from the Captain's report dated 18th January.)

The attempt at refloating made on the 18th January was a failure in part through the main engines stopping as the result of the cooling water-pipes becoming choked with sand. In order to get over this trouble and ensure that the engines would be available when needed the ship's engineers arranged a temporary circulating system, taking supplies from the sanitary tank on the bridge to the engines, and using the fore-peak tank as a storage tank from which the sanitary tank was filled ; by this means it was possible to keep the engines going for a spell at each high tide.

While waiting for the spring tides at the beginning of February the ship was shifted as far as possible every high tide. As preparation for the ensuing high tide advantage was taken of low tide to dig a trench in the sand astern of the ship, and also to shift the kedge and stern anchors a further stage out to sea. Then at each high tide the ship was taken a short distance seawards, the efforts of the main engines being backed by the deck machinery pulling on wires attached to the anchors out astern.

Towards the end of January the Captain was enabled to make an aeroplane survey of the channels in the sands, by courtesy of the commanding officer of the aerodrome at St. Valery ; and then on the night of 1st February the ship was floated off after working the main engines and pulling on the anchors for about an hour. The ship was then taken out to deep water by way of the channels surveyed by the Captain, and anchored to await the morning.

On 6th February the Askelad left St. Valery for London, arriving there four days later. Owing to a strike there was a difficulty in obtaining dry dock accommodation, but a survey with the ship afloat was carried out by representatives of the Norwegian Veritas, of the underwriters, and of the engine-builders. The underwriters' surveyor reported the presence of various cracks in the concrete. There were cracks in the centre keelson

DAMAGES AND REPAIRS

89

in nearly every frame space in the holds ; in most of the bottom frames in the holds near the centre-line ; and also in a few of the bottom frames near the bilges. But these cracks seemed to be only in the surface. As regards the deck, there were cracks in the raised portion between the hatches, and in the portion between No. 2 hatch and the fore end of the deckhouse ; these cracks all radiated from the hatch coamings at the centre-line of the ship, and were probably due to the hold pillars underneath

FIG. 41. — M.S. Askelad aground.

being forced up by the keelson when the ship was bumping over the sandbanks. Such an explanation is consistent with the presence of cracks in the keelson and floors. There was no indication of damage to the two forward bulkheads, but there were slight cracks in the bulkhead between the engine-room and No. 2 hold. There was a very small quantity of water in the bottom of the ship ; but the pumps had not been in use since the ship left St. Valery. This water was, however, completely bailed out and the bottom carefully examined ; only a few cracks were found, and these were in the bottom frames, low down. But

90 SEAGOING AND OTHER CONCRETE SHIPS

from the presence of the water it was inferred that there was a crack through the bottom, though it was obviously of little importance. In the report from which this information was extracted the underwriters' surveyor expressed the opinion that the ship was sufficiently seaworthy to go to Grimsby, but that she should be dry- docked there for examination of the bottom and of the propeller shafts.

The Askelad accordingly left the Thames on 7th March, and arrived at Grimsby on the 10th, where she was dry- docked two days later. It was found that some cement finish had been rubbed off and that there was a slight leak in No. 2 hold. A few patches of cement plaster were applied by the crew, but no other work was done on the concrete hull. There was a certain amount of work done to the machinery, the principal item being the renewal of the starboard propeller on account of the loss of a blade during the grounding or the refloating ; but no work was called for as the result of any defect in the concrete hull.

After the survey at Grimsby the Askelad was immediately put into service and was not again dry-docked until September, when she was surveyed at Moss as required by the Norwegian Department of Shipping in terms of the yearly certificate of seaworthiness. Following on this survey minor repairs were carried out on the deck fittings, and the cement finish on the deck was repaired in a few places. The total bill for the work done at this time amounted to kr. 1879-31 (about £100) ; of this amount the cost of the cement used was about two pounds, by far the major portion being due to alteration to deck fittings. It can safely be said that the total cost of repairing the concrete hull after the grounding on the French coast did not exceed twenty- five pounds.

Captain, officers, and crew deserve great credit for the work done in salving the ship. In recognition of this work the under- writers presented gold watches and chains to captain and chief engineer.

The grounding of the Garry Owen, referred to in Chapter I, did much to establish the reputation of the iron ship ; the grounding of the Askelad has equally established the reputation of the concrete ship.

M.S. "Nicanor." — This ship was built by the author's firm, and is of practically the same dimensions and type as the Namsen-

DAMAGES AND REPAIRS 91

fjord. During the night of llth April 1919 she ran on a sub- merged rock near South Torgersogap, when on a passage to Christiania ; subsequently the strong current in the channel carried her over on to another rock which held her abaft amid- ships. After vainly trying to get the ship off by her own power a call was sent out for a salvage boat, and one arrived during the following day. The salvage boat put a hawser on to the bows of the Nicanor, which were nearly under water, intending to pull alongside by means of her winch ; but the pull on the hawser, instead of bringing the salvage boat alongside, slewed round the bows of the Nicanor, causing her to slide slowly off the rock and dive to the bottom of the channel, where she rested almost on end in six fathoms of water. A month later the Nicanor was salved and taken to a steel ship builder for repairs.

A survey of the damage showed that there were ten holes in the concrete hull, some cement finish rubbed off, both bilge keels damaged, and the wood fender on the stern damaged. There was damage to machinery and accommodation as the result of immersion, and damage also to deck fittings and gear. The costs of the repairs, as assessed by Magistrate for insurance claim purposes, were :

£

Repairs of bottom and stem .... 250 ,, deckhouse, crew's quarters, painting,

etc 175

,, rails, boat davits, boat deck . . 75

,, engines . . . . . . 250

,, rigging, hatches, etc. .^ . .50

Equipment lost or destroyed .... 200

Dock dues 150

Total . .1,150

The ship in her damaged condition was valued at £2,800. Repairs were very expensive in 1919, but even so the concrete hull could easily have been repaired for £100 to £150, instead of £250 as given above. To the £100 or £150 there must be added, of course, the dry dock dues ; but these would not amount to £150, as given above, on account of repairs to concrete, for in the particular case the time in dry dock was determined by the other repairs, the concrete work only taking a week.

92 SEAGOING AND OTHER CONCRETE SHIPS

M.S. " Stier." — During a dense fog on the evening of 17th December 1918, when bound for Christiania, the Stier touched bottom in the Christianiafjord, but she slid over the obstruction and continued on her way ; the holds were sounded and found to be dry. Shortly afterwards the ship struck hard against a small reef, but again she slid off ; this time, though, there was leakage, for the fore peak was found to be flooded. Both holds were again sounded and found to be dry, the collision bulkhead holding good ; and the ship was able to make port under her own power.

The Stier was not repaired until several weeks had elapsed, and she made the passage round to Moss for repairs in her damaged condition. The work was carried out by a steel ship building firm, and the costs as assessed by Magistrate for insurance claim purposes were :

£ Repairs to bow ...... 325

Repairs to keel aft ..... 1

Removing interior ceiling for inspection . . 60 Overhauling winches, etc. .... 65

Dock dues 209

Total . . £660

The damage to the concrete hull could in this case also have been made good for a much smaller figure than given above ; in fact, the author's firm would gladly have done the work for £175, but for personal reasons the owner wanted the steel builder to do the work. And as the steel ship builder had no experience of concrete, and got no assistance from the classification society, since the Stier is not classed, the repairs were not carried out so fast or so cheaply as might have been.

S.S. "Polias." — This ship, while southward bound to Norfolk in light trim, was run on to the CiJley Ledge, off the coast of Maine, on 6th February 1920. At the time of the grounding the ship was running at full speed, making probably 9J to 10 knots. Eleven of the crew put off in one of the boats against the captain's orders ; they have not been heard of since, nor has any trace been found of their boat. The remainder of the crew, about thirty men, stayed by the ship overnight and were taken off by coastguards.

FIG. 42. — M.S. Stier in dry dock after grounding.

93

94 SEAGOING AND OTHER CONCRETE SHIPS

A few weeks after the accident an inspection was made by a representative from the U.S. Shipping Board, a few days of calm weather having allowed a diver to make a careful examina- tion of the underwater damage. The ship was found to be lying on a shelving rock, with the stern in about 1 1 feet of water, and the bow nearly submerged, at low tide. In grounding the ship had evidently passed between two jagged rocks, for the sides were ripped open practically from end to end, the depths of the openings varying from about two feet to about seven feet.

HHHHHHE

FIG. 43. — S.S. Polias aground on Cilley Ledge.

But the damage was found to be confined almost entirely to the shell, although in a few places small pieces had been torn out of the frames. A careful examination of the above water portion of the ship failed to discover structural damage ; the ship had evidently not deflected, as there were no cracks dis- cernible in the deck. Further information on the report of the Shipping Board representative, Mr. Lewis R. Ferguson, can be obtained in Engineering News-Record for 4th March 1920.

In the latter part of April 1920, Mr. Ferguson received a letter from the officer in charge of the coastguard near the Cilley Ledge ; in the letter was the following interesting statement :

DAMAGES AND REPAIRS 95

" Yes, the old steamer still lies in the same position, and tho' severe storms have washed over and around her since you were here she remains the same ; no apparent change has been noticed, and with the exception of the paint washing off I do not believe the hull has been damaged in the least.

" I am still of the opinion that the concrete boat is, if kept off the rocks, the strongest built ship afloat, as no steel or wood ship would have stood the severe storms that have beaten against the Polias during the past two months with such little damage being done."

The above statement should provide plenty of food for thought for those who will contemplate the probable fate of a steel ship of even the best construction after running on to these rocks at a speed of ten knots.

Owing to the depression in shipping the Polias has not been salved. She will probably remain for many years in her exposed position, bearing testimony to the strength and durability of the seagoing concrete ship.

Striking confirmation of the remarks in the previous para- graph comes to hand at the moment of going to press in tho following paragraph (reprinted from The Times Trade Supplement (Engineering Section, p. 173) of 22nd July 1922), which it has been ascertained refers to the Polias :

A WRECKED CONCRETE SHIP

In February 1920 a concrete steamship, 250 feet long, struck a sub- merged reef of rock off Port Clyde, U.S.A. Inspection of the vessel in the following July is said to have revealed no damage except a hole in the bottom, the concrete hull, decks, and bulwarks being in perfect condition in spite of the heavy seas to which they had been subjected. A second inspection in August 1921 disclosed little change in the state of the vessel. Some of the timber upper works had been washed away, but the hull appeared as solid as the rock on which it rested. According to recent reports the hull is still intact after exposure to the sea for over twenty-eight months. The chief of the salvage crew is reported to have stated that a steel or timber vessel would not have survived for more than three months in the same situation. The test is one showing very clearly the high resistance of reinforced concrete to exceptionally severe shocks and stresses.

CHAPTER VIII

COMPARISONS OF CONCRETE SHIPS WITH STEEL

SHIPS

First Cost — Units of Material and Labour per Ton — Examples of Costs — Speed — Strength — Running Expenses — The Future of the Concrete Ship.

First Cost. — It is very difficult to present reliable and useful information on first cost. Current market prices do not give any guidance, since, as is well known, during the present depres- sion in shipping ships change hands at prices far below the first costs. The majority of shipbuilders do not care to publish their cost data ; or, if they do publish any of it, they do so in such a form that it does not give a true idea of the cost of production. Further, the war-time inflation of wage rates and costs of materials introduces a disturbing element. Accordingly, the figures used in the comparison below can be taken as only approximately correct. But they are based on actual costs of completed ships ; the concrete ships were built by the author's firm, the steel ships by a firm on the west coast of Norway. Only hulls are taken into account in the comparison, since engines and equipment are practically the same whether the hull be of concrete or steel.

Concrete, Ships

Units ol Material and Labour per Ton. — The materials used are : Concrete of mixture 1 : 1-85 : 0-65 ; steel reinforcement of mild, medium grade, round rods, and second quality pine or spruce boards for centring :

One ton (2,240 Ib.) of concrete in the finished hull afloat requires :

f 1-9 barrels of Portland cement (at 3-8 cub. ft.). Concrete-^ 14 cub. ft. of sand. { 5 cub. ft. of gravel. 10 cub. ft. wood for centring.

96

CONCRETE AND STEEL SHIPS COMPARED 97 24 hours of carpenter work on centring.

, 14 concreting.

Labour 5 .

10 ?> plastering nnish.

,, erecting scaffolding and launching. 100 per cent, of cost of labour should be added for supervision and all other charges.

One ton (2,240 Ib.) of steel reinforcement in the finished hull afloat requires :

2,240 Ib. of steel delivered in the yard.

116 hours of bending, cutting, and placing.

100 per cent, of actual cost of labour for charges.

Notes. — Wood materials for the centring are assumed to be used three times.

Average wages for masons and helpers should be figured for plastering the cement finish. One cubic yard of concrete weighs 1-7 tons.

The cost of a concrete hull is found by adding the weights of concrete and steel multiplied by their respective unit prices. It is best to calculate separately the weight and cost of equipment.

The estimate can be summarized as follows :

Weight. Cost.

Concrete ..... Reinforcement .... Engines and equipment Deadweight ....

Displacement loaded in tons (at 2,240 Ib.) :

Steel Ships

The material used is steel of ordinary shipbuilding quality. One ton (2,240 Ib.) steel in the finished hull afloat requires :

2,240 Ib. of steel delivered in the yard. 104 hours of shaping, erection, and riveting. 100 per cent, of actual cost of labour for charges.

Notes. — The number of working hours per ton is an average of actual figures from seven ships, varying in sizes from 1,600 tons to 8,000 tons deadweight built between 1900 and 1919.

The 100 per cent, addition to the actual cost of labour, for

7

98 SEAGOING AND OTHER CONCRETE SHIPS

supervision (including foremen), overhead charges, tools, etc., is also an average figure, which may vary considerably. Sometimes this item is covered by adding a much lower percentage, namely between 30 and 50 per cent., to the cost of labour plus materials ; and this in the end gives practically the same figure.

The deadweight capacity is known, and it is useful to express the weight of hull in terms of the deadweight. For concrete ships the concrete and reinforcement should be figured separately. In the preceding chapters it has been shown that the majority of concrete ships have been constructed far too heavily. The Askelad and Faith have practically the same ratio of weight of hull to deadweight ; but since the exact quantities of steel and concrete are known only for the Askelad, data from her con- struction are used in the present calculations.

Concrete Ships

For Askelad : 1,076 tons deadweight and 628-0 tons con- crete give 0-583 ton (0-343 cub. yd.) concrete per ton deadweight ; 1,076 tons deadweight and 105-0 tons reinforcement give 0-0976 ton reinforcement per ton deadweight.

Steel Ships

The average gross weight of steel required in constructing the hulls of seven ships, varying in size from 1,600 to 8,000 tons deadweight, was found to be 36-5 per cent, of the deadweight. On account of waste in cutting plates, punching rivet-holes, etc., this amount is reduced by about one-tenth in the finished hulls ; but the gross quantity of steel should naturally be used as a oasis in determining the cost of production. Therefore :

0-365 ton of steel is required per ton deadweight.

Examples of Costs. — From the above data the costs of con- structing hulls of concrete and steel can be readily estimated for any prices of labour and materials. In Chapters II, III, and IV are given the actual costs of some concrete ships, but these are of no permanent interest ; neither are war-time prices of steel ships. Comparisons of practical value can only be made when and where it is desired to build either concrete or steel ships, and the costs must be based on the local prices of labour

COMPARATIVE EXAMPLES OF COSTS 99

and materials. It is of course impossible to say what these may be five or ten years hence, when shipbuilding perhaps again becomes normal after the present depression, but the following figures are assumed in order to give an example :

It is desired to build a cargo carrier of ordinary type, either of concrete or steel. Deadweight capacity to be 2,000 tons. Unit prices of materials and labour :

£ s. d.

Portland Cement, per barrel . . . 0 10 0 Sand and Gravel, per cub. ft. . . . 004 Second quality Pine and Spruce, per cub. ft. 020 Steel Reinforcing Rods per ton (2,240 Ib.) . 15 0 0 Steel Plates, Angles, etc., per ton (2,240 Ib.) 1600

Average wages for skilled tradesmen and their helpers :

£ s. d.

Carpenters per hour . . . . .016 Concrete workers per hour . . .013

Brick- masons (Plasterers) per hour . .020 General labour per hour . . . .010 Steel shipbuilders per hour . . .019

Concrete Hull

£ s. d.

Portland Cement, 1-9 barrels @ 10/- . . 0 19 0 Sand and Gravel, 19 cub. ft. @ 41 . . 064 Second quality lumber, 10 cub. ft. @ 2/- . 100 Carpenter work, 24 hours @ 1/6 . . 1 16 0

Concreting, 14 hours @ 1/3 . . . 0 17 6 Plastering, 10 hours @ 2/- . . .100 Scaffolding and launching, 18 hours @ I/- . 0 18 0 100 per cent, of cost of labour charges , 4116

One ton of Concrete . . .£1184

£ s. d.

Steel reinforcement, 1 ton @£15 . . 1500 Placing, bending, etc., 116' hours @ I/- . 5 16 0 100 per cent, of cost of labour for charges . 5 16 0

One ton of Steel Reinforcement , £26 12 0

100 SEAGOING AND OTHER CONCRETE SHIPS

£ s. cl

0-583 ton of Concrete @ £11 8s. 4d. . . 6 13 1 0-0976 ton of Steel Reinforcement @ £26 12s. 2 12 0

Cost per ton deadweight . .£951 2,000 tons deadweight @ £9 5s. Id., £18,508 6s. Sd.

Steel Hull

£ s. d.

Steel plates, angles, etc., 1 ton @ £16 . . 1600 Shaping, riveting, erection, etc., 104 hours

@ 1/9 . 920

100 per cent, of cost of labour for charges . 920

One ton of Shipbuilding Steel , . £34 4 0

0-365 ton Steel @ £34 4s £12 10 0

Cost per ton deadweight . . £12 10 0 2,000 tons deadweight @ £12 10s., £25,000.

From the above it is seen that, with the assumed prices of materials and labour, the steel hull costs : £25,000-£18,508 = £6,492 more than the concrete hull.

In other words : The hull of a steel ship is 35 per cent, more expensive in first cost than that of a concrete ship of the same type and deadweight capacity.

Speed. — Several elements combine to form the total resistance of a ship to motion through water ; but by far the most important element in the case of ordinary cargo carriers is the skin resistance, which amounts to nearly 80 per cent, of the total resistance in the case of a steel ship. Skin resistance is due to the friction of the water against the sides and bottom. Obviously the smoother the immersed surface the less the resistance. On steel ships the projecting plate edges and rivet-heads contribute appreciably to the skin resistance ; Mr. G. S. Baker has shown in a paper to the North- East Coast Institution of Engineers and Shipbuilders in 1915 that as compared with a smooth hull the additional resistance due to plate edges and rivet- heads amounts to about 10 per cent. Accordingly, due to her smooth surface, a concrete ship may be expected to show appreciably less resistance than a steel ship of the same dimensions and form. And it is with

CONDITIONS AFFECTING SPEED 101

this, as well as watertightness, in mind that the author recom- mends the application of a cement mortar finish to the outer surfaces of the hulls of concrete ships ; with careful trowelling the finished surfaces are very smooth and dense.

How far vibration, rolling, and pitching affect the speed of a ship can probably not be accurately ascertained, except through actual trials of full-size sister ships built of different materials. But it is a fact, proved beyond doubt, that concrete ships have easier movements and much smaller vibrations than similar steel ships. In the author's opinion these advantages, which are due to the greater stiffness and heavier sides of the hull, account to a considerable extent for the good speeds generally obtained by concrete ships.

Not long ago the author had an excellent opportunity of observing the movements in the hull of a steel ship. It was in the North Atlantic in November during a raging gale. The ship was a large passenger steamer about six hundred feet long, and practically empty as regards cargo — 600 tons of matches was all she carried — but the bottom ballast tanks were filled. The " panting " of this ship was most remarkable, especially when she was hit a hard blow in the fore- part of her bottom, while riding on the crest of another wave. And it seems logical that excessive resistance must be caused by such an undulating surface passing through water ; for instance, a pliable spear vibrating through the air will not travel as far as one that is more rigid. It should also be remembered that the vibration is two- fold in steel ships driven by engines ; as well as the temporary deflections of the hull from external forces of the waves, there is a perpetual vibration due to the engines.

That considerable deflections do take place in steel ships is amply proved by shorn-off rivets, and in many other ways. It is equally certain that they do not affect the concrete ship to any appreciable extent, otherwise cracks would at once appear in the surface of bottom and sides, even from deflections of fractions of an inch. No such cracks have been seen on any of the concrete ships built by the writer, which have now been in use for nearly four years.

Concrete ships are, however, in the matter of speed subject to one disadvantage, namely, increased displacement for given deadweight. The increased displacement involves increased

102 SEAGOING AND OTHER CONCRETE SHIPS

wetted surface, resulting in increased skin resistance. But this disadvantage will be diminished as the weights of concrete hulls are reduced.

Strength. — In preceding chapters it has been shown that concrete ships have been built having sufficient strength for normal service, and even, as in the case of the Askelad, sufficient strength for abnormal service.

Running Expenses. — The principal elements which combine to make up the total running expenses are : Interest on capital invested ; Depreciation ; Insurance ; Bunkers and Stores ; Crew's Wages and Provisions ; Handling of Cargo; Brokers' Fees ; Harbour and Dock Dues ; Upkeep and Repairs. It is the sum of these charges on revenue and items of expenditure which is of prime importance to the shipowner.

Several items of running expenses are the same for concrete ships as for steel ships of the same deadweight, namely, Bunkers, Stores, Crew's Wages, Provisions, Handling of Cargo, and Brokers' Fees. Harbour Dues are slightly larger for concrete ships, since they are based on register tonnage, which is larger for concrete ships than for steel ships of the same deadweight on account of increased dimensions. The charge made on revenue to cover Interest on Capital invested is less for a concrete ship than for a steel ship of the same deadweight ; this item, of course, depends entirely on first cost, or purchase price, and so the reduced cost of construction of the concrete ship involves an appreciable saving in running expenses.

The cost of Insurance ought to be rather less for concrete ships, but, in fact, underwriters have, up till now, demanded higher rates than for steel ships. The result is that some Nor- wegian owners of concrete ships have discontinued insurance, except for complete loss, as they have found it unnecessary to pay exorbitant premiums to cover costs of repairs which often are carried out by the crew in a few hours.

The greatest savings in the running expenses of concrete ships are accomplished on the scores of Depreciation, Upkeep, and Repairs. After four years of service there are no signs of attack from sea-water, rust spots on the unpainted concrete surfaces, nor other signs of depreciation on the ships built by the author's firm. A barge with pile driver, now belonging to the Moss Harbour Authorities, was docked for inspection on 20th June

RUNNING EXPENSES COMPARED 103

1921, after having been continuously in sea- water for four years and four days. The surface, when cleaned of seaweeds, was just as smooth and solid as it was four years ago. In no place was the finish rubbed off or loose. The docking, cleaning, and coating of the barge — which up to then had received no painting —with coal tar was done at the trifling cost of about £9. This little ship furnished proof of an interesting fact, namely, that outside cement finish can be applied a considerable time after the concrete has hardened, and yet will adhere perfectly. The hull was concreted on 23rd April 1917 and the following few days. The sides were plastered with cement finish between 4th and 9th May, and the under side of bottom between 15th and 19th May 1917.

The matter of repairs has been treated at some length in Chapter VII.

Actual figures for comparing the running expenses of concrete and steel ships under exactly the same conditions have not so far been available. One reason for this is the annual survey demanded by the classification societies or by the Director of Shipping. Another reason is the already mentioned attitude of the underwriters, who unnecessarily increase the insurance premiums. The principal concrete shipowner in Norway, Mr. Thygo Sorensen, of Christiania, expressed his opinion to the author substantially as follows :

" There is no doubt that concrete ships are cheaper to run, out up to the present considerable extra expense has been incurred by the annual survey (for steel ships only every four years), and by the fact that even the inner ceiling must be removed for inspection. Outside inspection of the hull ought to be sufficient, as long as it seems to be perfectly sound."

This is a reasonable attitude, and it will probably be only a matter of time before concrete ships are surveyed no more fre- quently than steel ships. Many cases of minor damage have occurred, where the concrete surface has suffered abrasion from collisions with docks, etc., but as regards seagoing ships such damage could nearly always have been avoided with more care. In a letter to the designers, Messrs. Leopold Walford, Ltd., London, express their opinion on the upkeep expenses of the S.S. Armistice (see Chapter XIII), estimating these to average about one-fifth of those for a steel ship working under the same

104 SEAGOING AND OTHER CONCRETE SHIPS

conditions. They base their views on figures noted for three typical steel ships, which respectively compare to the Armistice as 2 J to 1, 3 to 1, and 10 to 1. Their experience covers 1 J years of service.

The Future of the Concrete Ship. — There are no technical difficulties to prevent the building of concrete ships of much greater size than have already been built. The author believes, however, that with the present materials of construction the future of the concrete ship lies in sizes from about 2,000 tons to 6,000 tons deadweight. For short voyages between harbours of limited depth the smaller sizes are required, and for oversea cargo service the larger sizes should probably be economical. The construction of concrete ships of larger sizes than 6,000 tons requires relatively more steel reinforcement in the hull and more equipment in the builder's yard, as the centring is heavier to handle ; it is doubtful whether the cost per ton deadweight would be lower.

When a really satisfactory light-weight concrete is invented, with better elastic properties than at present, it will involve a great improvement and radically change the interior details of the hull. All frames will probably be eliminated ; in other words, the steel reinforcement will be embedded in a thick slab, where it will act as frames spaced very close together, and so will be very effective. The weight of reinforcement will be reduced for three reasons :

On account of the thick concrete sides absorbing more of the shearing strains, without the aid of reinforcement.

Because the steel near the inner and outer faces can be better utilized in a thick slab, having greater " effective depth."

Because with a concrete able to stretch slightly more than the present material, high carbon steel of much greater strength can be employed as reinforcement to full advantage. Such steel cannot be used in the construction of steel ships, where the material is exposed to twisting and bending as well as tension and compression ; but as reinforcement it can be used safely.

The exterior form of the ship should be maintained exactly as desired by the naval architect, but the elimination of interior frames would improve facilities for loading cargo. The cubic capacity for " bale " goods would be increased considerably because the massive slab would not be nearly as deep as the

FUTURE OF THE CONCRETE SHIP 105

present frames, and the saving on inside centring and work in placing the reinforcement is obvious. Such construction of sides would permit greater deflections, so reducing greatly the risk of injury from local blows, and the thickness would prevent minor damage from penetrating.

The author firmly believes that this improvement in concrete will come, and that it will play a very important part in the ship- building of the future. He does not dream of a concrete with an elasticity of steel or wood, nor does he expect the material to possess great tensile strength — the steel reinforcement supplies that ; but he does believe that a concrete will be developed which will stretch rather more than the present material. The new concrete will stretch sufficiently to prevent cracks forming around a reinforcement of high carbon steel worked to perhaps thirty per cent, higher tensile stress than is used now. The author anticipates also that this concrete will be between one- half and two-thirds of the weight of the present material. In conclusion the author may sum up his views as follows :

" With the present materials, seagoing concrete ships have been built cheaper than steel ships. They are seaworthy and strong, with low upkeep expenses and no higher fuel consumption than steel ships of the same deadweight. On account of their larger cubic capacity and better insulating qualities against temperature changes, they are especially suited for cargoes like lumber, coke, ice, fruit, etc."

Up to now seagoing concrete ships — or rather the builders of such ships — have hardly had a fair chance to develop the new construction, on account of war conditions and the following depression with over-production of steel and wood tonnage. It is not true that the seagoing concrete ship was a " war- pro- duct " or poor substitute doomed to sink into oblivion. It would have arrived regardless of the war, and shows even in its present crude state of development some advantages over steel ships, and a decided superiority over seagoing, engine- driven, ships of wood. Some years from now, when the excess of war-tonnage has been absorbed and when demand for tonnage begins to overtake the supply, the next chapter of concrete ship- building will commence. It will call for special reinforcement for concrete ships, manufactured to save field work, a lighter concrete, greater refinements of construction, especially of the

106 SEAGOING AND OTHER CONCRETE SHIPS

centring and placing of the concrete. The classification societies will have collected experience from the concrete ships in use, and will no doubt be less exacting in their demands ; and the result will be a type of ship built with one-third the amount of steel used in a steel ship, and that material thoroughly and permanently protected against corrosion.

CHAPTER IX SHIPBUILDING CONCRETE

Introductory — Portland Cement — Water — Aggregate — Impurities in Aggre- gate— Sand — Light-weight Aggregate — Proportions of Mixture — Mixing — Placing and Curing — Steam Curing — Freezing — Vibration, Pressure, etc. — Compressive Strength — Shear Strength — Bond Strength — Elasticity — Water- tightness — Contraction and Expansion — Trass Concrete — Action of Sea-water — Action of Oils, etc. — Repairs — Fire-resisting Power.

Introductory. — Concrete is probably the most commonly used material in modern constructional work. Not only are founda- tions and underground work almost exclusively built of this material, but superstructures such as buildings, bridges, dock walls, etc., are built of it to an extent that could not have been conceived fifty years ago. This vast development was made possible by two inventions — the manufacture of artificial Portland cement, and the reinforcing of concrete by steel.

The concrete of former days did not possess the strength or reliability of the present reinforced material, and could not be used to build an ordinary flat roof or floor. It was employed only as a mortar or for vault and arch construction like stone or brick work. The difference between the poorest grade of iron known to our ancestors and the shipbuilding steel of to-day is no greater than that between the concrete of fifty years ago and that used for the building of concrete ships. But there is still ample room for improvement in concrete whether for land or ship work.

Concrete for land work and concrete for ship work differ materially. Concrete for land work should be :

of strength and mixture as specified or as required by local building regulations.

composed of durable, clean materials, as cheap as possible, while of the specified quality. 107

108 SEAGOING AND OTHER CONCRETE SHIPS Concrete for ship work should be :

of maximum strength and elasticity, of maximum water tightness.

of minimum weight, subject to the strength being sufficient.

In this case the cost is of minor importance.

The fact that the cost is of minor importance in concrete for ship work may seem to be surprising. But it is explained by the other fact that the total cost of all the concrete materials in the hull of a seagoing concrete ship amounts only to about five per cent, of the total cost of the ship complete ; of this five per cent, the Portland cement makes up about three per cent. and the aggregate about two per cent. For lighters, in which there is no machinery and little deck equipment and fittings, the cost of the concrete materials amounts to about 10 per cent, of the total.

Concrete consists of the following materials :

Portland cement.

Water.

Fine aggregate (sand).

Coarse aggregate (gravel or broken stone).

Of these elements the cement and water are active, and the others inactive. It is obvious that the cement is of great influence in determining the quality of concrete ; but it is only recently that investigations have shown that the amount of water is also a matter of vital importance.

Portland Cement. — It is known from structures still in exist- ence that various kinds of cement were used even in ancient times. The cements used were, however, different from the Portland cement used to-day ; they were entirely of natural origin, whereas the present-day article is a factory product. Natural cements are still available, but they are rarely used since they are of erratic quality and are inferior in strength to the manufactured article.

Early in the nineteenth century the Frenchman Vicat tried to produce an hydraulic cement by burning a mixture of limestone and clay at a high temperature, but without satisfactory results. At about the same time the Englishman Joseph Aspdin worked

SHIPBUILDING CONCRETE 109

on the same lines and finally succeeded. Aspdin took out patents on his method, and called the product Portland Cement because in colour and hardness it resembled the building stone obtained from Portland. Owing to lack of chemical knowledge the early material was uncertain in quality and so was not much used. The accidental discovery that waste products from the burning when ground to a fine powder made a better cement was the foundation of the present methods of manufacture. And practical experience, together with extensive chemical investigation, has made Portland Cement a reliable material of exact chemical proportions whose properties need never be doubted if it is obtained from a reputable manufacturer.

Portland Cement is a finely pulverized mixture of burnt clay and limestone, having approximately the following analysis :

Silica. Alumina. Iron Oxide. Calcium Oxide. Magnesia.

Si02 A1203 Fe203 CaO MgO

19-25% 5-9% 2-4% 60-64% 1-2-5%

The raw materials are obtained from many sources, but they are always proportioned in such a manner that the chemical analysis of the finished product agrees closely with the figures above.

The development in the use of Portland Cement can be roughly appreciated from figures of production. In the United States the annual production was 990,000 barrels in 1895, and about 94 million barrels in 1917, practically a hundredfold increase in 22 years. In Germany 29 factories produced in 1877 2,200,000 barrels ; in 1907 the production was 26,750,000 barrels from 87 factories ; and at the outbreak of the war the annual output was approximately 50 million barrels.

Setting and Hardening. — According to latest investigations during and after manufacture, Portland Cement contains three principal compounds which harden by hydration :

Tri-calcium silicate (3CaO . Si02). Di-calcium silicate (2CaO . Si02). Tri-calcium aluminate (3CaO . A1203).

Of these tri- calcium silicate seems to have the greatest cementing quality. It is the last constituent completed during manufacture and is formed by combination of calcium oxide

110 SEAGOING AND OTHER CONCRETE SHIPS

(CaO) with 2CaO . Si02. Some free CaO is also present in amounts depending on the burning process. The iron oxide, magnesia, alkalies, etc., have little effect on the three principal cementing compounds, but are added to bring about a combination of CaO with alumina (A1203) and silica (Si02) during manufacture. Hardening takes place in the following order :

Tri-calcium aluminate (3CaO . A1203) ; Tri-calcium silicate (3CaO . Si02) ; Di-calcium silicate (2CaO . Si02).

When water is added to Portland Cement these compounds are first of amorphous and later both crystalline and amorphous character, acting much like ordinary glue. The hardening continues under water, as the minerals are nearly insoluble. The initial set of Portland Cement is no doubt due to hydration of tri-calcium aluminate.

Specification. — All ordinary requirements and tests have been standardized in detail and are practically identical in countries where Portland Cement is manufactured. In general the consumer will find it most practical to send samples for testing to laboratories which specialize in this work. A descrip- tion of such tests can readily be obtained from any testing laboratory or from any handbook on ordinary concrete con- struction. Briefly the following requirements must be fulfilled :

(1) Definition. — Portland Cement is the product obtained by finely pulverizing clinker produced by calcining to incipient fusion an intimate and properly proportioned mixture of argil- laceous and calcareous materials, with no additions subsequent to calcination excepting water and calcined or uncalcined gypsum.

I. Chemical Properties

(2) Chemical Limits. — The following limits should not be exceeded :

Per cent.

Loss on ignition . . . . . 4-00

Insoluble residue ..... 0«85

Sulphuric anhydride (S03) . . . 2-00

Magnesia (MgO) 5-00

II. Physical Properties

(3) Specific Gravity. — The specific gravity of cement shall not be less than 3-10 (3-07 for white Portland Cement). Should

SHIPBUILDING CONCRETE 111

the test of cement as received fall below this requirement a second test may be made upon an ignited sample. The specific gravity test will not be made unless ordered.

(4) Fineness. — The residue on a standard No. 200 l sieve shall not exceed 22% by weight.

(5) Soundness. — A pat of neat cement shall remain firm and hard, and show no signs of distortion, cracking, checking, or disintegration in the steam test for soundness.

(6) Time of Setting. — The cement shall not develop initial set in less than 45 minutes when the Vicat needle is used or 60 minutes when the Gillmore needle is used. Final set shall be attained within 10 hours.

(7) Tensile Strength. — The average tensile strength in pounds per square inch of not less than three standard mortar briquettes composed of 1 part cement and 3 parts standard sand, by weight, shall be equal to or higher than the following :

Age at Test, Storage of Tensile Strength,

days. Briquettes. Ib. per sq. in.

7 1 day in moist air, 200

6 days in water

28 1 day in moist air, 300

27 days in water

(8) The average tensile strength of standard mortar at 28 days shall be higher than the strength at 7 days.

The above example is extracted from Standard Specifications and Tests for Portland Cement worked out by a special Committee representing the U.S. Government, American Society of Civil Engineers, and American Society for Testing Materials in 1916.

Storage. — The best Portland Cement may be destroyed before use by being stored in a wrong manner. The storage house must be absolutely weatherproof with floor at least 2 feet above ground level and free air circulation under the floor. Instead of windows there should be covered openings for ventilation and the cement must be placed at least 8 inches away from external walls and the floor. It should be stored so that inspection and samples can be readily taken from each shipment, which is kept separate until approved.

Cement in bags piled on top of each other frequently tends

1 i.e. 200 wires per inch.

112 SEAGOING AND OTHER CONCRETE SHIPS

to harden from the pressure (" warehouse set "). This does no harm and is broken up by tossing the bags about, as the hardening is not due to any chemical action in the cement.

A moderate amount of seasoning improves Portland Cement, which sometimes contains a little free lime, which causes expansion during hardening. By seasoning this is first slaked and then changed to calcium carbonate, which does not swell when hydrated.

Water. — It is generally advisable to use fresh water when making concrete. But sea-water can be used in rich mixtures, such as shipbuilding concrete ; the results of extensive tests do not indicate any detrimental effects from the use of sea- water with such mixtures.

The water should be of ordinary clean, drinking quality ; free from impurities such as oils, acids, alkalies, or vegetable matter. Acids or alkalies are easily detected by litmus paper, oils are detected by iridescent surface films, and vegetable matter and other impurities either float in, or give a bad taste to, the water. If in any doubt, chemical analysis and tests should be made to decide the effect of the water on the strength and hardening of the cement.

Water reacts chemically with Portland Cement and forms a binding composition of amorphous and crystalline character, which unites the grains of fine and coarse aggregate in the con- crete. It also carries the cement particles over all surfaces of the aggregate and promotes close adhesion by filling with the cementing substance all minute irregularities between the aggregate filler. Further, a certain amount of water is required to lubricate the concrete mass in order to reduce friction between the particles and allow the concrete to be properly placed in the forms.

The binding strength of cement depends upon the interlacing of crystals, and crystallization, as is well known, will only take place from a saturated or supersaturated solution. If insufficient water is supplied the chemical reaction will, naturally, stop before it is completed. Too much water is also bad, because it dilutes the cementing compound and reduces the strength of the binding substance, even if this afterwards is partly recovered when the water evaporates. Further, small air bubbles are often enclosed by superfluous water and adhere to the surfaces of the

SHIPBUILDING CONCRETE 113

aggregate, sometimes even to the extent of displacing the finest aggregate ; this defect frequently occurs also as the result of excessive mixing. The various elements in concrete, cement, water, fine aggregate, and coarse aggregate, all occupy definite amounts of space. If the concrete is placed in watertight forms all the materials remain in the mass ; whereas if the forms are not watertight some of the water will escape, either before or after the concrete has hardened. But when the forms are removed any water remaining uncombined can escape, either by evapora- tion, gravity, or capillary action ; and the escape of uncombined water leaves spaces in the concrete. Hence an excess of water reduces the strength of concrete ; it also reduces the durability, for porous concrete is subject to penetration by water or other liquids of chemical action which may freeze with a bursting effect, so causing deterioration.

A result of excess water is frequently evident in cases where concreting has been stopped for a day. A chalky substance— laitance — gathers on the surface of the material last poured ; this is composed of light particles of inactive cement which have floated to the top and remain there as a creamy substance, possessing no strength, and so detrimental to the attainment of a good joint.

The strongest and most waterproof concrete is secured by thorough mixing with the addition of the minimum amount of water for complete hydration of the cement. The amount of water should be determined by means of actual tests such as are described below. The water should be added gradually, and the cement and aggregate should be mixed dry before any water is added. The results of some tests showing the effects of varying amounts of water are given in Table C on p. 126.

Aggregate. — The inactive elements of concrete, sand, gravel, crushed stone, etc., all classed as aggregate, make up about 80 per cent, of the total volume. And the quality of this ' ' filling ' ' material is just as important as that of the active, or binding, ingredients.

There is no definite distinction between sand and small gravel. It is customary, however, to consider all particles of gravel, crushed stone, or other material less than J inch diameter to be fine aggregate, and to classify as sand all mineral particles between two millimetres and 0-5 millimetre diameter. All 8

114 SEAGOING AND OTHER CONCRETE SHIPS

particles larger than J inch diameter are termed coarse aggregate. In concrete for land work the coarse aggregate is generally from f inch to 1J inch diameter ; but in concrete for shipbuilding purposes the coarse aggregate should not exceed \ inch diameter.

The essential qualities of an aggregate for shipbuilding con- crete are : maximum density, hardness, durability, light weight, and insolubility in water. These qualities are possessed in varying degree by materials belonging to the following main groups ; and aggregates in common use generally belong to one or other of these :

Igneous Rocks, such as, for example, Granite, formed by the consolidation of molten matter. Granite is composed almost entirely of minerals, quartz, orthoclase, and mica or hornblende, without any cementing substance. It is exceedingly hard and dense ; and it has the strength and durability of a first-class aggregate, but is rather lacking in toughness. Trap Bock, or Diabase, is another volcanic rock of high compressive strength, and it adheres well to cement. It is an excellent aggregate except when it contains much iron in low oxides, for these expand by absorption of oxygen and may rupture the concrete.

Sedimentary Rocks, such as, for example, Sandstone. Sand- stone is in structure a natural concrete, depending for its character upon the different aggregates present, which may be quartz, felspar, hornblende, chlorite, magnetite, etc., cemented together by oxides of iron and carbonates of lime or clay ; the strength and hardness depend on the quality of the cementing substance. Sandstones are not, in general, suitable aggregates for ship- building concrete since they lack strength and durability. Lime- stone, carbonate of lime deposited under water and subsequently hardened, is another example of a sedimentary rock. Some types are chemical products, others are formed from shells of small animals or hardened tissues of plants. Limestone rarely con- sists of pure carbonate of lime and is found in many colours, white, yellow, blue, green, etc., frequently containing some magnesia. It is generally considered to be a suitable aggregate for land construction ; but when it is crushed to a small size, as for shipbuilding concrete, it ruptures in a flaky manner, and so it should be thoroughly tested with varying mixtures.

Metamorphic Rocks (Conglomerates). — These geological forma- tions may contain rocks of varying origins, and their qualities

SHIPBUILDING CONCRETE 115

must be thoroughly investigated by chemical analysis and practical tests. Gravel is natural rock broken away from parent ledges and worn round by rolling in rivers ; it possesses, therefore, the same qualities as the parent rock, and if of good mineral quality is a very satisfactory aggregate for shipbuilding concrete. The surface is generally rough and well suited for the adhesion of cement.

Artificial Aggregates, such as Crushed Bricks, Cinders, Blast- furnace Slag, and similar materials are used in cases where strength and watertightness are not of importance.

Impurities in Aggregate. — Silt, which consists of particles between 0-5 millimetre and 0-005 millimetre in diameter, and Clay, which consists of particles less than 0-005 millimetre in diameter, are both as a rule harmful, although a small amount (about five per cent.) of finely pulverized, perfectly clean, clay improves the watertightness of the less rich concretes ; but this is a risky method of trying to obtain watertightness, for the clay has a tendency to form lumps which obviously cause weak spots. Clay should not be used in any form in shipbuilding concrete.

Mica is very harmful in high-grade concrete. It has hardly any strength ; and the surface is not made moist by water, so that the cementing compound does not adhere and the mica is merely loosely embedded in the concrete mass.

Iron Pyrites (Fe2S), a bright yellow substance, is a common impurity in stone. In contact with water it forms sulphuric acid, which attacks cement with disastrous results. In coarse aggregate, however, it is not so harmful as in fine aggregate, where it is more active in forming acids, and where its presence should be carefully prevented.

'Stone Dust (crushed stone screenings) has practically the same effect as Silt or Clay. It is never of value in high-grade concrete such as is used in shipbuilding, and should be removed from the aggregate by careful washing.

Organic impurities are all harmful. The most common organic impurity is Loam, which not only prevents cement from adhering to mineral grains of sand but seems to have also a chemical action which is at present under investigation. Tannic Acid, Colloidal Sewage, Manure, Sugar, Tobacco Juice (Spit), etc., are examples of organic impurities having very injurious effects on concrete. Other impurities, too minute to be seen,

116 SEAGOING AND OTHER CONCRETE SHIPS

must be detected by chemical analysis, or by practical tests where a lack of strength is difficult otherwise to explain.

Most organic impurities can be removed by careful washing. Hence the first condition for a satisfactory aggregate is that it shall be perfectly clean.

Sand. — All fine aggregates come from rocks which have disintegrated. Sand is the natural deposit of such material, carried for thousands of years by rivers towards the sea. Changes which have taken place during the vast periods of time and travel are partly physical and partly chemical. The physical effects have not changed the character of the particles from that of the parent rock, which is merely broken up and reduced in size. For instance, a quartz sand contains silicates of exactly the same type as the parent rock; it is probably the best sand for all concrete work.

Chemical changes of the fine aggregate which have taken place during thousands of years are quite different from the physical changes. The particles decompose, losing their original character, and enter into new compositions ; examples of such change are clay and silt. As a rule chemical changes are harmful.

The composition and character of the original rocks are of great importance. For instance, a fine aggregate obtained from sandstone consisting of quartz grains cemented together with calcium carbonate or clay is not suitable for shipbuilding con- crete. It is often white and very pleasing to the eye, but the cementing clay absorbs water during the mixing of the concrete and forms a soft putty, which separates the sand particles and prevents contact with the Portland Cement, so reducing the strength of the concrete. Calcium carbonate may be detected by muriatic acid, which will effervesce if calcium carbonate is present.

Sand originating from limestone formed by the fossilizing of minute prehistoric shells is not suitable as a fine aggregate, since it is easily decomposed and contains tiny voids.

Sea sand is generally satisfactory, but it should be taken from the bottom, not from the beach where the grains are polished and smooth from being rubbed together by the waves instead of having the rough irregular surface which enables the cement particles to adhere intimately. Further, beach sand contains more organic matter than sand from the bottom or from above

SHIPBUILDING CONCRETE 117

the beach. Saline deposits do not seem to be harmful in rich concretes.

The sand grains should be of varying sizes. Standard testing sand used in laboratories passes through a No. 20 sieve and remains on a No. 30 sieve ; the grains are therefore of uniform size, and so the sand has a large amount of voids. Mortars made with such sand are not strong ; but most regulations for concrete construction accept a strength equal to that from tests with standard sand. For shipbuilding concrete, however, such a strength is not sufficient, and the very best quality of sand is required for mortar and concrete. As pointed out above, the cost is of less importance than in land construction, and the material may accordingly be washed and screened in a more thorough manner.

The customary manner of specifying fine aggregate, or sand, for land construction is merely to state that the material should be " sharp, clean, and coarse." Individual opinions may differ considerably as regards these qualities, and the specification is not sufficiently exact for the high-class aggregate required for shipbuilding concrete. For shipbuilding concrete the fine aggregate must have :

Cleanness, determined by careful washing, by chemical tests, or by both methods together. Sand containing more than one per cent, of mica should be prohibited. ,

Coarseness, determined by granulometric screening.

Strength, determined by actual compression tests with mortars and concretes at 7 days and 28 days with different mixtures.

Light-weight Aggregate. — Extensive experiments were carried out by the Concrete Ship Section of the U.S. Shipping Board in order to develop an artificial aggregate of light weight. Experi- ments towards the same end ha^e been carried out also by the author.

The author burned clay in a limekiln under various conditions of moisture and temperature and succeeded in obtaining an aggregate which floats in water owing to the air-cells blown in the material. The strength was not, however, comparable to that of first-class gravel, and much of the advantage as regards lightness was lost when the material was crushed down to the sizes required in shipbuilding concrete ; many of the air-cells were broken up and so the unit weight increased. Particulars

118 SEAGOING AND OTHER CONCRETE SHIPS

of the U.S. Shipping Board material can be obtained in Engineering News-Record, vol. Ixxxii, No. 17, p. 802.

Concrete made with any of the light-weight aggregates which have sufficient strength to be considered for shipbuilding pur- poses weighs about 100-110 Ib. per cubic foot, that is, about 75 per cent, of the weight of gravel concrete. But when it is borne in mind that the reduced strength of the light-weight concrete involves the use of more concrete in the ship in order to attain a desired standard of strength, it is obvious that the saving in weight of hull is not so great relatively as the saving in weight per cubic foot.

Light-weight aggregate is harsh and unpleasant to work, and readily forms pockets in the concrete on account of the porous, sharp surfaces grinding against each other, thereby causing excessive friction between the pieces of aggregate and reinforcement. This fact accounts for the easy shattering of the shell from an external blow recorded with reference to the S.S. Cape Fear in the last report (21st January 1921) of the " Special Committee on Concrete Ships and Barges " to the American Concrete Institute. In none of the collisions, ground- ings, etc., of concrete ships built by the author's firm, in which gravel concrete was used, has damage in the form of cracks or shattering of surrounding concrete extended appreciably beyond the local wound ; the crushing has always been clearly defined and limited.

The author does not agree with the frequent assertions that the light-weight aggregate is waterproof because each air-cell is closed off from its neighbours ; simple experiments — for example, floating a few pieces of the aggregate in water — show that after a few weeks, at most, the pieces lose buoyancy and finally sink. It is believed that Lloyd's Register have not so far been satisfied with the waterproof qualities of the light-weight aggregate. Of course, mixing with Portland Cement, which fills up the pores, greatly adds to the watertightness. When, further, special coatings and paints are applied to the concrete surface a ship built with light-weight aggregate can probably be made perfectly watertight.

Proportions of Mixture. — Scientists and engineers are at present trying to determine general rules for securing the best possible grade of concrete. But from the nature of the problem

SHIPBUILDING CONCRETE 119

it is not probable that definite rules will cover all cases, since finished concrete depends for its quality not only on the correct proportions of the ingredients, but on the mixing, placing in the forms, and conditions during the setting and hardening.

The following considerations should be borne in mind when deciding the proportions for shipbuilding concrete :

1. The compressive strength after 28 days of age should not be less than 4,000 Ib. per sq. inch.

2. The watertightness should be perfect for pressures due to at least the full depth of the ship in which the concrete is to be used.

3. The mixture should be plastic and easily worked around the steel reinforcement in the forms without too much water being used.

If the first condition is fulfilled the shearing strength, abrasive quality, and adhesion to the steel will generally also be satisfactory.

If the second condition is fulfilled the density of the concrete will generally be satisfactory, thereby assuring durability pro- vided the aggregate is of the highest class.

If the third condition is carefully maintained, the result will be an all-round good quality of concrete. The bad effects of too much water have already been explained. On the other hand; the mixture must not be so dry that there is insufficient water for the chemical reaction or that the concrete clogs between the reinforcing rods and leaves hollow spaces. The amount of water should not always be constant, but should vary according to the temperature, speed of concreting, and position in which the concrete is to be placed. In bottom and deck the concrete is readily worked around the reinforcement even if the mixture is fairly dry. In the ship's sides this is not possible, nor in bulkheads, narrow beams or stanchions, and so in these places the concrete must be relatively moist.

The author has found from practical experience gained during four years by the construction of about 30 concrete ships that the proportions of the mixture should be about

1 part Portland Cement, 2-J- parts Aggregate.

The mixture found to be most satisfactory with the brand

120 SEAGOING AND OTHER CONCRETE SHIPS

of Portland Cement and the local aggregates used in the ships built Ijy the author's firm was

1 part Portland Cement, 1-85 parts Sand, 0-65 part Gravel.

It may be mentioned that in the Namsenfjord the mixture used in the deck and bottom was

1 part Portland Cement, 1-4 parts Sand, 2-6 parts Gravel.

The mixture used in the sides was

1 part Portland Cement, 1-5 parts Sand, 1-5 parts Gravel.

The difference between the proportions used in the Namsen- fjord and those used latterly is the result of experience. Gravel is difficult to work around steel reinforcement in confined spaces, and it cannot be mixed in mortar which is plastered on, for the gravel jumps out when the mortar is thrown on to the metal mesh. Apart from these considerations, a large amount of gravel in the mixture not only tends to cheaper concrete but also to stronger concrete. Compare, for example, the following results from tests made by the author :

Mixture. Age. Compressive Strength.

1:2 . .3 months 4,270 Ib. per sq. inch

l:2i . . „ 3,840 „

l:lj:2i . „ 4,520 „

l:lf:2| . „ 4,880 „

Since cement is the most expensive ingredient of concrete it is obvious that the last mixture, containing 1 part cement to 4 parts aggregate, is cheaper, besides being stronger, than the first mixture, containing 1 part cement to 2 parts aggregate. But for shipbuilding concrete compression tests made in a labora- tory do not always indicate the most satisfactory proportions, because watertightness and easy-working quality are of greater importance in relation to compressive strength than in the case of concrete for land construction.

SHIPBUILDING CONCRETE

121

In the ships built for the U.S. Shipping Board the mixture used was generally

1 part Portland Cement, 0-67 part Sand, 1-33 parts Gravel.

As a general rule the mixture should not be made richer than 1 part cement : 2 parts aggregate, because expansion, contraction, and Modulus of Elasticity increase with the proportion of cement. On the other hand, the mixture should not be leaner than 1 part cement : 3 parts aggregate, because watertightness then becomes uncertain ; the ship may not actually leak, but water will pene- trate into the concrete and cause corrosion of the reinforcement. The following table gives average values of the compressive strengths of various mixtures, as determined from tests carried out by the author :

TABLE A.— AVERAGE COMPRESSION VALUES OF VARIOUS MIXTURES

Proportions

of Mixture Cement : Sand : Gravel .

Percentage of Water by Volume.

Compression, Ib. per sq. inch, average after

7 days.

28 days.

fl :

2-50 : 0-00

15

2,020

3,540

1 : 2HI :

2-00 : 0-50

15

3,180

3,060

\1:

1-85 : 0-65

w

3,320

4,130

1:3 1 :

2-25 : 0-75

14i

2. 005

3,225

f1:

1-50 : 2-50

11

2,990

3,885

1:4 { 1 :

1-90 : 2-10

12

2,450

3,345

1

2-25 : 1-75

13

2,220

2,730

All tests were made on 8" X 8" X 8" cubes at the Christiania Materials Testing Laboratories according to instructions from the author. The concrete was not rammed, but the sides of the forms were tapped lightly and the free surface smoothed off with a straight board.

The amount of water is stated as a percentage of the total volume of cement, sand, and gravel. The materials were always proportioned by volume (not by weight).

The sand was retained on a No. 30 and passed through J inch screen. The gravel was retained on J inch and passed through